My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
030221
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2021 9:05:47 AM
Creation date
2/25/2021 9:05:45 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/2/2021
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> TR 1850 Gateway Blvd. T 510.446.8301 <br /> Suite 1000 TRCcompanies.com <br /> Concord,CA 94520 <br /> February 11,2021 <br /> Adam Nelkie <br /> Senior Civil Engineer,Engineering Department <br /> City of Pleasanton <br /> D: (925)931-5675 <br /> C:(925)818-4418 <br /> F:(925)931-5479 <br /> anelkie@citvofpleasantonca.gov <br /> P.O. Box 520,200 Old Bernal Ave. <br /> Pleasanton, CA 94566 <br /> SUBJECT: Bridge Preventative Maintenance Program(5 Bridges) <br /> Amendment No.1 Request <br /> Dear Mr. Nelkie: <br /> Thank you for the opportunity for having TRC to provide Construction Management services for the project.We look forward <br /> to continuing our successful relationship to deliver future projects with the City. <br /> As discussed,TRC's has exhausted our original contract budget because of increased overtime and administration cost not <br /> originally budgeted.These costs we directly related to changed conditions in the project,specifically to the waterline on Santa <br /> Rita Road. Upon initial discovery of these conflicts,the our resident engineer coordinated and conducted various meetings <br /> with the City,design engineers,contractor,and subcontractors.Once extra work commenced in the field,the resulting work <br /> required our inspector to spend overtime to monitor and document the extra work.These hours have been provided to the <br /> City and we respectfully request a contract amendment in the amount of$31,700.00. Please let me know if you need <br /> additional information. <br /> Staff Additional Hours Additional Budget <br /> Bonaventure Ezeji, PE- 95.00 $21,800.00 <br /> Resident Engineer <br /> Naji Chidica, PE- 41.00 $9,900.00 <br /> Construction Inspector <br /> Amendment Amount= $31,700.00 <br /> Contact Information <br /> As your contract manager, I can be reached via phone at(925)383-9105 or email me at RChek@trccompanies.com. <br /> Respectfully submitted, <br /> TRC Engineers,Inc. <br /> - 01A1/C/g4 <br /> Rany Chek, PE,QSP/D <br /> Vice President/Regional Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.