Laserfiche WebLink
G-4.05 <br /> <br />G-4.06 <br /> <br />Three consecutive points shown on the same rate of slope must be used <br />in common, in order to detect any variation from a straight grade, and <br />in case any such discrepancy exists, it must be reported to the <br />engineer. If such a discrepancy is not reported to the engineer, the <br />contractor shall be responsible for any error in the finished work. <br /> <br />The contractor shall preserve all stakes and points set for lines, <br />grades, or measurements of the work 'in their proper places until <br />authorized to remove them by the engineer. <br /> <br />SAMPLES AND TESTS: <br /> <br />At the option of the engineer, the source of supply of each of the <br />materials shall be approved by the engineer before delivery is started <br />and before such material is used in the work. Representative <br />preliminary samples of the character and quality prescribed shall be <br />submitted by the contractor or producer of all materials to be used in <br />the work, for testing or examination as desired by the engineer. <br /> <br />All tests of materials furnished by the contractor shall be made in <br />accordance with Section 6 of the Standard Specifications, State of <br />California, Department of Transportation, July 1984 Edition, or such <br />special methods and tests as are prescribed in these specifications. <br /> <br />The contractor shall furnish such samples of materials as are <br />requested by the engineer, without charge. No material shall be used <br />until it nas been approved by the engineer. Samples will be secured <br />and tested whenever necessary to determine the quality of material, <br />and the contractor will pay the laboratory costs of these tests. <br /> <br />DEFECTIVE MATERIALS OR WORK: <br /> <br />All materials not conforming to the requirements of these <br />specifications shall be considered as defective, and all such <br />materials, whether in place or not, shall be rejected and shall be <br />removed immediately from the site of the work, unless otherwise <br />permitted by the engineer. No rejected material, the defects of which <br />have been subsequently corrected, shall be used until approved in <br />writing by the engineer. <br /> <br />Any work which does not conform to the requirements of these <br />specifications shall be considered as defective, and all such <br />materials, whether in place or not, shall be rejected and shall be <br />removed immediately from the site of the work, unless otherwise <br />permitted by the engineer. No rejected material, the defects of which <br />have been subsequently correct, shall be used until approved in <br />writing by the engineer. <br /> <br />Any work which does not conform to the requirements of these specifi- <br />cations or is deficient in construction, shall be rejected by the <br />engineer and be replaced by the contractor at his own expense and <br />without allowance for the additional cost of such replacement to the <br />contractor. <br /> <br />CDS.1.6 25 <br /> <br /> <br />