My WebLink
|
Help
|
About
|
Sign Out
LINE B-2-3 AND B-2-4
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
XYZ
>
ZONE 7
>
LINE B-2-3 AND B-2-4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2011 11:43:40 AM
Creation date
5/14/2004 10:35:01 AM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
6/10/1987
LONG TERM AGREEMENTS - NAME
ZONE 7
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
LONG TERM AGREEMENTS - NOTES
PROJECT 86-11
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G-4.07 <br /> <br />Upon failure on the part of the contractor to comply with any order of <br />the engineer made under the provisions of this article, the engineer <br />shall have authority to remove and replace defective material or work <br />at the expense of the contractor, and the contractor and his sureties <br />shall be liable therefor. <br /> <br />EROSION CONTROL: <br />Adequate provisions shall be made for silt and erosion control. Silt <br />shall be prevented from entering the existing drainage system by use <br />of staked straw bales if there is rain during construction. <br /> <br />CDS.I.6 26 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.