My WebLink
|
Help
|
About
|
Sign Out
LINE B-2-3 AND B-2-4
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
XYZ
>
ZONE 7
>
LINE B-2-3 AND B-2-4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2011 11:43:40 AM
Creation date
5/14/2004 10:35:01 AM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
6/10/1987
LONG TERM AGREEMENTS - NAME
ZONE 7
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
LONG TERM AGREEMENTS - NOTES
PROJECT 86-11
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION G-5 - LEGAL RELATIONS AND RESPONSIBILITY <br />G-5.01 CONTRACTOR'S RESPONSIBILITY FOR DAMAGE: <br /> <br />Neither the public agency, governing body, nor the engineer shall be <br />answerable or accountable in any manner for any loss or damage to the <br />work or any part thereof; for any material or equipment used in <br />performing the work; for injury to any person, either workmen or the <br />public.; nor for damage to adjoining property from any cause whatsoever <br />during the progress of the work, or at any time before final <br />acceptance by the governing body. <br /> <br />The contractor shall indemnify and save harmless the public agency and <br />the engineer from any suits, claims or actions brought by any person <br />for injuries or damages sustained or arising in construction of the <br />work or in consequence thereof. <br /> <br /> cause <br />The contractor shall restore or to be restored all damaged <br />property, including sidewalks, curbing, pipes, conduits, gas, water <br />and other services, sewers, monuments, stakes and other public or <br />private property to a condition as good as when he entered upon the <br />work. <br /> <br />If the contractor violates any of the terms of these specifications or <br />the contract, the governing body and its officers or agents, shall be <br />entitled to hold or withhold and retain anything of value, whether the <br />same is in actual possession of the contractor, or at any place within <br />the district boundary; the same to be withheld pending liquidation of <br />any resultant damages and adjustment thereof in accordance with law. <br /> <br />G-5.02 PATENTS: <br /> <br />The contractor shall assume all responsibilities arising from the use <br />of patented materials, equipment, devices or processes used on or <br />incorporated in the work. <br /> <br />G-5.03 INSURANCE: <br /> <br />(a) Workmen's Compensation Insurance: <br /> <br />The contractor shall maintain a~dequate workmen's compensation <br />insurance under the laws of the State of California, and shall <br />provide employers' general liability insurance for the benefit of <br />his employees and the employees of any subcontractor under him, <br />not protected by such compensation laws. Proof of insurance <br />satisfactory to the governing body shall be given by filing <br />certificates of insurance with the governing body in form <br />satisfactory to the governing body. If insurance is underwritten <br />by any agency other than the State Compensation Fund, such agency <br />shall be ~ company authorized to do business in the State of <br />California. <br /> <br />CDS.1.6 27 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.