My WebLink
|
Help
|
About
|
Sign Out
LINE B-2-3 AND B-2-4
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
XYZ
>
ZONE 7
>
LINE B-2-3 AND B-2-4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2011 11:43:40 AM
Creation date
5/14/2004 10:35:01 AM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
6/10/1987
LONG TERM AGREEMENTS - NAME
ZONE 7
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
LONG TERM AGREEMENTS - NOTES
PROJECT 86-11
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G-6.10 PROGRESS OF THE WORK, TIME FOR COMPLETION, EXTENSION OF TIME: <br /> <br />G-6.11 <br /> <br />G-6.12 <br /> <br />The actual construction under these proceedings shall, upon execution <br />and award of the contract, be commenced within 10 days after notifica- <br />tion to the contractor from the engineer or other authorized agent of <br />the governing body, notifying the contractor to commence work, but not <br />earlier than the date of execution of the contract. The contract <br />shall thereafter be diligently prosecuted from day to day until <br />completion within a period not to exceed 60 working days from and <br />after the date of commencement of work. In the event of delays beyond <br />the control of the contractor, he may apply to the engineer and the <br />governing body for an extension of time for completion, in accordance <br />with the provisions of the Municipal Improvement Act of 1913. <br /> The Contractor shall pay to the City of Pleasanton the sum of FIVE <br /> HUNDRED DOLLARS ($500.00) per day, for each and every calendar day <br /> delay in finishing the work in excess of the number of working days <br /> described above, as liquidated damages, although allowances shall be <br /> made for delays due to inclement weather. <br /> <br /> DELAYS BY PUBLIC AGENCY: <br /> Any act of, or any omission of anything required to be done by the <br /> public agency, Pacific Gas and Electric, the State of California, <br /> Pacific Bell, or their officers, agents or employees, which shall <br /> cause the contractor delay in the completion of the work shall be <br /> grounds for extension of time on the part of the contractor ~o <br /> complete the work but shall give the contractor no damages for delay. <br /> <br /> FAILURE TO COMPLETE CONTRACT: <br /> In the event of the failure of the contractor to complete the work <br /> within the time limited in the contract, or within such further time <br /> as the governing body grants, the governing body may then relet the <br /> contract for the unfinished portion of the work, in the manner <br /> provided by the Municipal Improvement Act of 1913, or complete it by <br /> force account. Such reletting or doing said work by force account <br /> shall not relieve the original contractor of his sureties from <br /> liabilities on their bonds. <br /> <br />CDS.1.6 33 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.