My WebLink
|
Help
|
About
|
Sign Out
LINE B-2-3 AND B-2-4
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
XYZ
>
ZONE 7
>
LINE B-2-3 AND B-2-4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2011 11:43:40 AM
Creation date
5/14/2004 10:35:01 AM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
6/10/1987
LONG TERM AGREEMENTS - NAME
ZONE 7
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
LONG TERM AGREEMENTS - NOTES
PROJECT 86-11
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Laboratory shall mean any laboratory approved by the City to test <br />materials and work involved in any public improvements. <br /> <br />e. State shall mean the City. <br /> <br />1-03 Utilities. <br /> <br /> a. Reconstruction, relocation or adjustment: In the event any <br /> P.G.&E., Pacific Bell or A.T.&T. facilities are encountered, the <br /> Contractor shall effect the necessary coordination to have these <br /> structures removed, relocated, and/or adjusted as necessry by the <br /> respective utility cQmpanies. <br /> b. Damages to Existing Water or Sewer Facilities: The work shall be <br /> so prosecuted that minimum damage will be done to existing water <br /> or sewer facilities. In the event that water services are broken <br /> or damaged between the meter and the point of service, the <br /> Contractor shall immediately, at his own expense, repair such <br /> damage in a manner satisfactory to the Engineer, in order that the <br /> water supply will not be interrupted for a period greater than one <br /> (1) hour. If such interruption is sustained, it shall be the <br /> Contractor's responsibility to notify the occupants of the <br /> premises to which said services are connected so that no damage <br /> will occur on said premises. Whenever damage is done to water <br /> mains, water meters, services between the mains and meters., fire <br /> hydrants or other appurtenances, the City shall make such needed <br /> repairs and the cost thereof shall be borne by the Contractor. <br /> Whenever sewer facilities are broken or damaged, the Contractor <br /> shall take immediate steps to provide for the continuation of flow <br /> and shall make complete repairs as soon as practicable and the <br /> full cost thereof shall be borne by the Contractor. <br /> <br /> c. Damages to Gas, Electric or Telephone Services: Caution shall be <br /> exercised in the prosecution of the work so gas, electric or <br /> telephone services will not be damaged. In the event damage is <br /> done to any gas, electric or telephone facility by the Contractor, <br /> he shall immediately notify the respective utility company. <br /> Repairs shall be made by the utility company at the Contractor's <br /> expense. <br /> <br /> The Contractor shall notify the Pacific Gas and Electric Company, <br /> A.T.&T. and Pacific Bell at least three (3) days in advance of <br /> such time that excavation or other work is to be done on any <br /> section of the work in order that the utility company may mark the <br /> location of underground lines and do such work as is required to <br /> maintain uninterrupted service to all premises. <br /> <br /> 1-04 Salvage of Existing Materials: Signs and any other materials directed <br /> to be salvaged by the Engineer shall remain the property of the City and <br /> shall be stockpiled on the job site; or at a location directed by the <br /> Engineer. Reasonable care shall be taken in removing and handling <br /> salvagable materials to prevent undue damage. <br /> <br />CDS.1.7 <br /> <br />1-2 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.