Laserfiche WebLink
SECTION 2 <br /> <br /> CLEARING AND GRUBBING <br /> <br />2-01 Clearing d Grubbing shall conform to the applicable provisions of <br /> Section ~ of the Standard Specifications with the following <br /> modifications: <br /> <br /> a. No burning of material will be-allowed within the right-of-way <br /> without the specific permission of the Engineer. When allowed, <br /> burning shall be in accordance with the ordinances of the City and <br /> the applicable rules and regulations of the Bay Area Air Pollution <br /> Control District. <br /> <br /> b. Unless otherwise noted on the plans, clearing and grubbing shall <br /> be performed within the entire channel improvement right-of-way <br /> area including the channel, accessways and drainage ditches. <br /> Clearing shall also be performed in areas where it is necessary <br /> for allowing the excavation of trenches and the installation of <br /> cast-in-place pipe. Clearing shall also include the removal of <br /> miscellaneous items including fencing, pipes and riprap as shown <br /> on the improvement plans. <br /> <br /> c. Existing warning, regulatory and guide signs shall be removed and <br /> replaced if necessary. All signs removed by the Contractor shall <br /> be delivered and stored in a location designed by the Engineer. <br /> <br /> d. All deleterious materials shall be removed to a minimum depth of 3 <br /> feet from finish grade. <br /> <br /> 2.02 Measurement and Payment. Clearing and grubbing will be paid for at the <br /> contract lump sum price. <br /> <br /> Payment shall include full compensation for removing and disposing of <br /> all deleterious materials and miscellaneous items and the cost of all <br /> applicable permits that may be required. <br /> <br />CPS.1.8 2-1 <br /> <br /> <br />