Laserfiche WebLink
15-16 <br /> <br />After construction of the cast-in-place pipe is complete, an inspection <br />report by the inspector shall be submitted to the Engineer of any <br />sampling or testing on the cast-in-place pipe within one week of any <br />such sampling or testing. <br /> <br />The inspector shall gather all testing data and shall submit a final <br />inspection report to the Engineer certifying that the pipe was <br />constructed in conformance with the specifications and has <br />satisfactorily passed all tests. <br /> <br />On all cast-in-place pipe permit projects., which include construction of <br />cast-in-place pipe, a soils engineer must test to ensure minimum 90% <br />compaction in the pipe support area of the trench, to ensure the <br />integrity of the trench bottom and to approve the stability of the <br />vertical trench walls. The trench walls must stand vertically from <br />bottom of trench to top of pipe. The soils engineer is to be provided <br />by the contractor (or developer) at his expense. Compaction results <br />shall be made available to the Engineer upon completion of test. <br /> <br />Measurement and Payment. The quantity to be paid for will be the number <br />of lineal feet of pipe properly placed measured horizontally from end to <br />end without deduction for structures where the pipe is cast continuously <br />through the structure. <br /> <br />Payment will be at the contract unit price per lineal foot for cast-in- <br />place pipe and shall include trenching, furnishing materials, casting, <br />placing and compacting backfill, all independent testing and all other <br />incidentals. <br /> <br />CDS.1.14 15-7 <br /> <br /> <br />