Laserfiche WebLink
29-05 <br /> <br />29-06 <br /> <br />In no case shall the extreme minus tolerance extend continuously over an <br />area exceeding 200 square feet. <br /> <br />The grout shall be placed to a depth of twelve (12) inches from the rock <br />surface in one course only. The grout for the cutoff walls shall be <br />placed to the full depth of the walls in twelve (12) inch layers. <br /> <br />Prior to groutng, the rock shall be flushed with water to wash down the <br />fines. The rock shall be kept wet just ahead of the actual placing of <br />grout. T~e grout shall be brought to the place of final deposit by <br />methods approved by the Engineer and discharged directly on the rocks, <br />using a splash plate of metal or wood to prevent displacement of rock <br />directly under the discharge. The flow of grout shall be directed with <br />brooms, spades or barrels to prevent it from fl owing excessively along <br />the same path, and to assure that all voids are filled. <br /> <br />Sufficient barring shall be done to loosen tight pockets of rocks and <br />otherwise aid the penetration of grout. All brooming on the slopes <br />shall be uphill, and after the grout has stiffened, the entire surface <br />shall be rebroomed to eliminate runs and to fill voids caused by <br />sloughing of the grout. After completion of any strip or panel, ~no <br />workman or other load shall be permitted on he grouted surface for a <br />period of twenty-four (24) hours. The grouted surface shall be <br />protected from injurious action by the sun and shall be protected from <br />rain, flowing water, and mechanical injury, and shall be cured as <br />specified by the Engineer. <br /> <br />Weep Holes: Weep holes shall be provided by placing fiber tubes or pipe <br />(4-inch minimum diameter) through the grouted rock at a five foot <br />longitudinal spacing. The tubes used to form weep holes shall extend a <br />minimum distance of two (2) inches into the filter blanket. Cardboard <br />or fiber tubing shall be removed after concrete grout has set and before <br />completion of work. <br /> <br />Measurement and Payment. The quantity to be paid for will be the number <br />of cubic yards of rock placed (not including the filter blanket) as <br />determined from the dimensions shown on the plans or the dimensions <br />directed by the Engineer. <br /> <br />Payment will be at the contract unit price per cubic yard for grouted <br />rock slope protection and shall include payment for furnishing and <br />installing all materials, trenching for cut-off walls, installing weep- <br />holes, placing filter blanket and concrete grout and all. other <br />incidentals. No separate payment will be made for earthwork, filter <br />materials or concrete grout. <br /> <br />CDS.1.18 29-3 <br /> <br /> <br />