My WebLink
|
Help
|
About
|
Sign Out
LINE B-2-3 AND B-2-4
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
XYZ
>
ZONE 7
>
LINE B-2-3 AND B-2-4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2011 11:43:40 AM
Creation date
5/14/2004 10:35:01 AM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
6/10/1987
LONG TERM AGREEMENTS - NAME
ZONE 7
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
LONG TERM AGREEMENTS - NOTES
PROJECT 86-11
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
31-07 <br /> <br />31-08 <br /> <br />The slurry mixture shall be applied within two hours of mixing. In so <br />far as practical the mixture shall be applied starting at the bottom of <br />slopes and working up. The slurry shall be applied in a sweeping motion <br />so as to allow the fibers to build on each other until a uniform cover <br />is achieved and the material has been applied at the required rate. <br /> <br />No worker shall be allowed on the areas after hydr0seeding. <br /> <br />Reseeding. The Contractor shall notify the Engineer and schedule a <br />joint inspection of the seeded areas between 30 and 60 days after the <br />first fall rains. Areas to be repaired and reseeded will be delineated <br />by the Engineer and the Contractor shall effect the necessary repairs <br />and reseeding as soon as possible thereafter. Eroded slopes shall be <br />smoothed over, including the filling of rills or gullie~,~before <br />reseeding starts. The reseeding operation shall follow the <br />specifications herein. <br /> <br />Measurement and Payment. Erosion control will be paid for at the <br />contract.lump sum price. <br /> <br />Payment shall include full compensation for furnishing all materials and <br />equipment necessary to complete the erosion control planting as <br />specified, including repairs and reseeding. <br /> <br />CDS,1.20 31-3 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.