My WebLink
|
Help
|
About
|
Sign Out
SPORTS PARK IMPROVEMENTS 1983
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
XYZ
>
ZONE 7
>
SPORTS PARK IMPROVEMENTS 1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2010 4:33:46 PM
Creation date
5/14/2004 11:20:27 AM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
4/12/1983
LONG TERM AGREEMENTS - NAME
ZONE 7
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- 4 - <br /> <br /> D. ZONE 7 agrees to allow CITY to design, administer and construct the <br />undergrounding of electrical service to Well No. 4. In furtherance thereof, <br />ZONE 7 agrees to do the following: <br /> <br />1. Review and approve plans and specifications for the electrical <br /> service to Well No. 4. <br /> <br />2. Inspect the construction as required unless this function is <br /> delegated to CITY. <br /> <br />Pay the CITY, upon billing, for the full cost (100%) of design <br />and construction of the electrical service to Well No. 4 from the <br />Project's transformer to the well site. Design costs to be based <br />upon Exhibit "B" and construction costs based upon final total <br />payment to contract for this item. Bids for the above work shall <br />be submitted to ZONE 7 for approval by its General Manager prior <br />to award of construction contract. <br /> <br /> E. ZONE 7 agrees to allow CITY to design, administer, and construct a <br />service road for vehicular travel, approximately 10 feet wide by 800 feet long, <br />located between Parkside Drive and Well No. 4 as shown on Exhibit "A". ZONE 7 <br />shall pay the CITY, upon billing, for one-half the cost of design and construction <br />of said service road. Design costs shall be based on Exhibit "B" and construction <br />cost shall be based on final total payment to contractor for this item. Bids <br />for above work shall be submitted to ZONE 7 for approval by its General Manager <br /> <br />prior to award of construction contract. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.