Laserfiche WebLink
-5- <br /> <br />II. Responsibility of CITY <br /> <br /> CITY agrees to construct the Project and, in furtherance thereof, agrees <br /> to do the following: <br /> <br /> A. Prepare all engineering plans, specifications and estimates for <br /> the project, tncludtn§ all ZONE 7 related items and modifications to the <br /> Project as a result of ZONE 7 review. <br /> <br /> B. Secure all responsible agency approvals, permits, and other <br /> requirements. <br /> <br /> C. Administer and inspect the Project's contract and bill ZONE ? for <br /> those items of responsibility cited in Section I. <br /> <br /> D. CITY shall pay the full cost (100%) of hauling the removed <br />material from the Arroyo Mocho dredging as covered in Section I.B. <br /> <br /> E. CITY shall install and pay for all fencing and gates necessary <br />for ZONE to gain access to their Well No. 4 site via the Pleasanton <br />Canal maintenance road for major repairs. <br /> <br />III. Ownership <br /> <br /> A. Upon acceptance of construction by both agencies, the ownership <br /> of the 12-inch water line and the telemetry conduit shall rest with <br /> <br />ZONE 7. <br /> <br /> <br />