Laserfiche WebLink
This chapter describes the City's water service reliability under various hydrologic conditions, including a <br />severe drought for the next five years. The City's existing and planned water management tools for <br />increasing water supply reliability are also addressed. Responses to actual water shortage conditions are <br />detailed in Chapter 8 of this plan. <br />The reliability of the City's potable water supply is largely dependent upon its water supply from Zone 7 <br />and Zone 7's water supply reliability policy. On October 17, 2012, the Zone 7 Board approved a revised <br />Water Supply Reliability Policy (Resolution No. 13-4230, included as Appendix 1), which adopts the <br />following level of service goals to guide the management of Zone 7's treated water (also referred to as <br />municipal and industrial or (M&I) supplies and its Capital Improvement Program (CIP): <br />Goal 1: Zone 7 will meet its treated water customers' water supply needs, in accordance <br />with Zone 7's most current Contracts for M&I Water Supply, including existing and projected <br />demands as specified in Zone 7's most recent UWMP, during normal, average, and drought <br />conditions, as follows: <br />At least 85 percent of M&I water demands 99 percent of the time <br />100 percent of M&I water demands 90 percent of the time <br />Goal 2: Provide sufficient treated water production capacity and infrastructure to meet at <br />least 80 percent of the maximum month M&I contractual demands should any one of Zone <br />7's major supply, production, or transmission facilities experience an extended unplanned <br />outage of at least one week. <br />7.1 WATER SERVICE RELIABILITY ASSESSMENT <br />Approximately 80 percent of the City's water is purchased from Zone 7, which is comprised of treated <br />surface water blended with some local groundwater. The remaining 20 percent comes from local <br />groundwater pumped from wells owned and operated by the City. As discussed in Chapter 6, the <br />groundwater basin is managed by Zone 7, and the City has a GPQ. Additionally, the City receives recycled <br />water from the DSRSD RWTF (through an agreement with DERWA) and the LWRP. <br />As the City's exclusive potable water wholesaler, Zone 7's water supply reliability greatly affects the City's <br />water supply reliability. Therefore, a significant portion of this section presents the constraints on Zone <br />7's existing and planned water sources and summarizes the historical basis for projecting available <br />supplies in various hydrologic conditions (i.e., normal year, single dry year, and five consecutive dryyears). <br />The City's water service reliability is then presented in five-year increments through 2045 based on earlier <br />analysis of water use (Chapter 4 of this plan) and water supply (Chapter 6 of this plan). Finally, this section <br />discusses the City's water management tools and options to promote regional supply reliability and <br />minimize the need to import water from other regions. <br />7.1.1 Constraints on Water Sources <br />This section discusses the constraints on Zone 7's water supply sources that affect their reliability and <br />Zone 7's strategies for managing the risks associated with each supply. Constraints on groundwater and <br />recycled water are also discussed. <br />WEST YOST 7-1 City of Pleasanton <br />2020 Urban Water Management Plan <br />May 2021 <br />