My WebLink
|
Help
|
About
|
Sign Out
14 ATTACHMENT 1 EXHIBIT A
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
060121
>
14 ATTACHMENT 1 EXHIBIT A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2021 1:11:04 PM
Creation date
5/20/2021 4:52:18 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/1/2021
DESTRUCT DATE
15Y
Document Relationships
14
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2021\060121
14 ATTACHMENT 1 EXHIBIT B
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2021\060121
14 ATTACHMENT 1 EXHIBIT C
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2021\060121
14 ATTACHMENT 1 EXHIBIT D
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2021\060121
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF <br />Chapter 7.: , _, � .. <br />Water Service Reliability and Drought Risk Assessment PL£ASANTON <br />7.1.1.1 Potable Water from Zone 7 <br />One of them a in limitations of Zone 7's water system is the lack of interties. All of Zone 7's imported water <br />supplies are conveyed through the Delta and the SBA; Arroyo Valle water is also conveyed through the <br />SBA. Zone 7 has been working closely with DWR, VW, and ACWD to improve the reliability of the SBA. <br />Between 2003 and 2012, DWR made improvements to the SBA within Zone 7's service area to increase <br />capacity and improve reliability. The work included a new pump station (180 cubic feet per second (cfs)), <br />inline reservoir (500 AF) and increased the canal carrying capacity to 380 cfs. As part of this project, Zone <br />7 had an emergency slide gate installed to maintain service in the event of a pipeline rupture downstream. <br />Zone 7 will continue coordinating with DWR and South Bay Contractors to improve the reliability of the <br />entire SBA system <br />In addition, Zone 7 is pursuing the following projects to diversify its conveyance options: <br />Reliability Intertie — Zone 7 is also planning for the construction of a reliability intertie with <br />another major water agency that would provide an alternative means of conveying water to <br />Zone 7's service area when the Delta and/or the SBA undergo an outage. For example, an <br />intertie with EBMUD could convey treated water supply to the western portion of Zone 7's <br />service area. <br />• Chain of Lakes Pipeline — This pipeline would allow for access to water stored in the Chain <br />of Lakes as an alternative local water supply; water would be accessible to the Del Valle <br />Water Treatment Plant (WTP) via one of the SBA turnouts. <br />Specific constraints for each of Zone 7's supplies are discussed below. <br />7.1.1.1.1 Imported Water: State Water Project <br />Two key constraints on imported water from the SWP are Delta conveyance and water quality. Each <br />constraint is detailed below. <br />7.1.1.1.1.1 Delta Conveyance <br />Zone 7's long-term contract with DWR for SWP water provides Zone 7 access to Table A water (and Article <br />56c water or carryover), Article 21 water, Article 56d water, and Yuba Accord water. As an SWP contractor, <br />Zone 7 is also able to use SWP facilities for conveying water transfers or exchanges of SWP water (from <br />another contractor) or from another water agency outside of the SWP system. SWP water moves through <br />the Delta before it is conveyed by the California Aqueduct and the SBA to Zone 7's water facilities. <br />The instability of the aging levees in the Delta (including their vulnerability to seismic events and climate <br />change), regulatory uncertainty, water quality issues including saltwater intrusion, and the declining <br />health of the Delta ecosystem all challenge the long-term reliability of the SWP and, more generally, the <br />water conveyance capability of the Delta. These issues directly challenge the Tri -Valley's long-term water <br />supply reliability since a majority of Zone 7's water supply is and will continue to be tied to the Delta and <br />SWP system. <br />WEST YOST 7-2 City of Pleasanton <br />2020 Urban Water Management Plan <br />May 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.