Laserfiche WebLink
THE CITY OF <br />Chapter 7.: , _, � .. <br />Water Service Reliability and Drought Risk Assessment PL£ASANTON <br />In 2018, DWR published their Delta Flood Emergency Management Plan, which provides strategies for <br />responding to Delta levee failures. This plan includes a strategy to establish an emergency freshwater <br />pathway from the central Delta along Middle River and Victoria Canal to the export pumps in the south <br />Delta. The plan also includes the pre -positioning of emergency construction materials at existing and new <br />stockpile and warehouse sites in the Delta. The plan has found that using pre -positioned stockpiles of <br />rock, sheet pile and other materials, multiple earthquake -generated levee breaches and levee slumping <br />along the freshwater pathway can be repaired in less than six months. <br />The DWR Delta Levees Subventions and Special Projects Programs have prioritized, funded, and <br />implemented levee improvements along the emergency freshwater pathway and other water supply <br />corridors in the central and south Delta. These efforts are complementary to the Delta Flood Emergency <br />Management Plan, which, along with pre -positioned emergency flood fighting materials, ensures <br />reasonable seismic performance of levees and timely pathway restoration after a severe earthquake. <br />Furthermore, Zone 7 and other SWP contractors are currently working with DWR and other key <br />stakeholders to address the many complex issues undermining the Delta through the proposed DCP. The <br />proposed new diversion structure in the northern Delta provides alternative intakes in case the Delta is <br />affected by an earthquake, levee failure, or some other catastrophic event that impacts water quality and <br />prevents pumping from the Delta. The DCP would also provide alternative intakes that could be used to <br />minimize harm to endangered and threatened species in the Delta. DWR is working closely with regulatory <br />and natural resource agencies to address regulatory uncertainty and protect the Delta ecosystem under <br />an adaptive management framework based on the best available science. With these benefits, the DCP is <br />expected to significantly alleviate constraints on SWP operation and provide more water supply reliability. <br />Zone 7 is also participating in the Los Vaqueros Reservoir Expansion project, which includes construction <br />of the Transfer -Bethany Pipeline. This pipeline would provide an alternative means of conveying water <br />supply to Zone 7 when the Delta is inaccessible. More details can be found in Chapter 6 of Zone 7's <br />2020 UWMP. <br />7.1.1.1.1.2 Water Quality <br />There are water quality concerns associated with transport through the Delta. In 1982, DWR formed the <br />Interagency Delta Health Aspects Monitoring Program to monitor water quality in the Delta and protect <br />human health. The program was renamed the Municipal Water Quality Investigations Program in 1990. <br />From a municipal water supply perspective, water quality issues in the Delta are associated with salinity <br />from seawater intrusion, wastewater effluent discharges, agricultural drainage from the islands, and <br />recreational activities. Water quality issues of specific concern to Zone 7 are: <br />Algal byproducts— Parameters of concern include compounds that cause taste and odor <br />(T&O) and algal toxins. T&O is primarily a problem in the warmer months when algal blooms <br />may be present. It can affect supplies from the Delta and from Lake Del Valle (which stores <br />SWP water). Algae produce geosmin and 2-methylisoborneol, which are key T&O-causing <br />compounds in surface water supply. Algal toxins derived from blue-green algae can also be a <br />concern. Zone 7's new ozonation facilities (recently installed at the Del Valle WTP and <br />scheduled for completion at the Patterson Pass WTP in 2022) effectively treat algal <br />byproducts. Without ozonation, high levels of algal byproducts in both Delta and Lake Del <br />Valle supplies may necessitate temporarily switching to groundwater supplies; blending of <br />sources is also an option depending on the source of algal byproducts and severity. <br />WEST YOST <br />7-3 <br />City of Pleasanton <br />2020 Urban Water Management Plan <br />May 2021 <br />