Laserfiche WebLink
THE CITY OF <br />Chapter 7.: , _, � .. <br />Water Service Reliability and Drought Risk Assessment PL£ASANTON <br />Water collected from the local watershed is protected under the SBA Watershed Protection Program Plan. <br />In general, the water quality of Arroyo Valle runoff is good and does not affect the reliability of this water <br />supply; however, as noted above, T&O can also affect supplies from Lake Del Valle. Zone 7 treats T&O <br />using ozonation, although a switch to groundwater supplies is sometimes necessary under excessive levels <br />ofT&O compounds. Algal blooms in the lake can also reduce production capacities, though new ozonation <br />facilities at the Del Valle WTP has significantly reduced the impact. <br />7.1.1.1.3 Chain of Lakes <br />The future Chain of Lakes will provide significant local storage, but uncertainty surrounds its complete <br />transfer to Zone 7. Favorable economic conditions could extend gravel mining operations, and even after <br />mining ceases, reclamation must occur. This could delay a full transition of the Chain of Lakes to Zone 7 <br />to about 2060. Zone 7 continues to work closely with the mining companies and quarry operators so <br />planning efforts can be coordinated. <br />With future completion of the Chain of Lakes Pipeline around 2025, Zone 7 can begin to use the available <br />lakes to store imported or local surface water. This will also enhance groundwater recharge in the <br />Main Basin. <br />7.1.1.1.4 Non -Local Storage <br />Access to banked water in Semitropic and Cawelo—both located downstream of Zone 7—requires <br />exchange(s) with other SWP contractors located south of Kern County (e.g., Metropolitan Water District). <br />There must be sufficient water flowing through the Delta and California Aqueduct system to facilitate <br />these exchanges, which could be challenging during a drought. Furthermore, the banked water must be <br />conveyed through the Delta, rendering this supply susceptible to the Delta disruptions described in <br />Section 7.1.1.1. <br />During the recent drought, access to banked water became uncertain because of the historically low <br />Table A allocation (leading to minimal amounts of water moving through the SWP) and the potential <br />cessation of pumping in the Delta to control salinity intrusion. DWR was able to manage salinity so that <br />Delta pumping could continue, and, with coordination among stakeholders including Zone 7, DWR <br />prioritized the delivery of banked water to Zone 7 and other SBA contractors. Ultimately, even during the <br />serious drought conditions in 2014 and the minimal 5 percent SWP allocation, Zone 7 was able to <br />successfully recover almost 15,000 AF, or approximately 78 percent of the maximum recovery requested <br />by Zone 7. In 2015, Zone 7 recovered approximately 18,000 AF from non -local storage. <br />Zone 7 will continue to coordinate closely with DWR, other SWP contractors, Semitropic, and Cawelo to <br />ensure the future reliability of the banked water supplies. <br />Some of Semitropic's wells are affected by arsenic. This contaminant is currently being managed through <br />treatment before the affected groundwater water is pumped into the California Aqueduct. Arsenic criteria <br />have been established for this "pump -in" by the DWR Facilitation Group to mitigate any impacts to the <br />downstream SWP contractors. Semitropic and the banking partners have developed a coordination <br />process for discussing arsenic treatment. While the presence of arsenic in the Semitropic groundwater <br />bank is likely to increase the cost of this water storage option, it is not likely to affect its overall reliability. <br />WEST YOST 7-5 City of Pleasanton <br />2020 Urban Water Management Plan <br />May 2021 <br />