Laserfiche WebLink
THE CITY OF <br />Chapter 7.: , _, � .. <br />Water Service Reliability and Drought Risk Assessment PL£ASANTON <br />7.1.1.2 Groundwater <br />Chapter 6 of this plan details the issues affecting the City and Zone 7's use of the Main Basin, specifically <br />water quality management and prevention of overdraft. <br />Zone 7 is actively implementing its Salt and Nutrient Management Plan. Salinity levels are being addressed <br />primarily through groundwater pumping and demineralization using the MGDP in the Mocho wellfield. <br />The facility simultaneously allows for the export of concentrated minerals or salts from the Main Basin <br />while improving the water quality of treated water. <br />Zone 7 has several groundwater wells with naturally -occurring Cr(VI) concentrations near the MCL and <br />PFAS above the notification limit. In response, Zone 7 is actively managing flows from the affected wells. <br />Conditions are regularly monitored, and management actions may change in the future. A PFAS treatment <br />facility is under consideration for construction based on pending regulations. <br />Zone 7 continues to study the groundwater basin and develop new tools (e.g., an improved groundwater <br />model) to better understand the levels of groundwater extraction possible under various conditions while <br />maintaining levels above the historical levels that have been reached in certain portions of the Main Basin <br />("historic lows"). Zone 7 also plans to augment its ability to recharge the Main Basin (e.g., through the <br />Chain of Lakes) to increase local storage and allow for more pumping when necessary, which will improve <br />both water supply reliability and salt management. Zone 7 plans to build an additional demineralization <br />facility to continue to decrease the salt content of the Main Basin. <br />Finally, Zone 7 plans to build additional wells to allow for improved management of groundwater levels <br />and to increase groundwater production capacity during droughts and surface water -related outages. A <br />new booster pump station will improve Zone 7's ability to convey groundwater throughout Zone 7's <br />service area and increase production capacity. <br />The City has a GPQ of 3,500 AFY from the Main Basin, which comprises approximately 20 percent of its <br />water supply. The City may also carry over any unused portion of its annual GPQ up to a total of 700 AF. <br />GPQ's for the Main Basin were determined based on the natural sustainable yield of the Main Basin. As <br />such, the City's groundwater supply from its GPQ is considered reliable under all hydrologic conditions. <br />7.1.1.3 Recycled Water <br />The recycled water that the City receives comes from DSRSD's RWTF and the LWRP, which are described <br />in Section 6.2.5.2. Both facilities produce Title 22 disinfected tertiary recycled water. The City anticipates <br />no significant changes to the land uses in either DSRSD's or Livermore's wastewater service area; <br />therefore, it does not anticipate any changes to the quality of the wastewater effluent used to produce <br />recycled water. The City does not expect recycled water quality issues to impact its ability to reliably <br />deliver recycled water to its customers. <br />On March 25, 2019, DERWA found that it cannot meet the combined peak demands and projected <br />demands of its member agencies (DSRSD and EBMUD) and its retailer, the City. DERWA approved <br />Resolution No. 19-3 (Appendix J) requesting that its member agencies take action to reduce recycled <br />water demands and implement a connection moratorium. As discussed in Section 6.2.5.1.1, the City <br />maintains the first right to use the secondary effluent produced from wastewater originating from the <br />City's wastewater collection system for recycling. While the City's recycled water supply is limited by the <br />secondary wastewater effluent from its service area, this supply is expected to meet the City's current <br />and projected recycled water demands. <br />WEST YOST 7-6 City of Pleasanton <br />2020 Urban Water Management Plan <br />N-680-00-20-04-wP-a-680-2020uwMP May 2021 <br />