Laserfiche WebLink
THE CITY OF <br />Chapter 7 <br />Water Service Reliability and Drought Risk Assessment PLEASANTON. <br />7.1.3.3 Water Service Reliability - Five Consecutive Dry Years <br />In Chapter 7 of its 2020 UWMP, Zone 7 has indicated it can meet retailer demands during five-year <br />droughts beginning in 2025, 2030, 2035, 2040 and 2045. Therefore, Zone 7 supplies to the City are <br />assumed to equal the City's projected potable water demands after accounting for the City's GPQ, which <br />is expected to remain at 3,500 AFY in each year of a five-year drought. Recycled water supplies are also <br />assumed to be unaffected by dry conditions. <br />Table 7-6 shows that the City's supplies are adequate to meet projected demands during five-year <br />droughts through the planning period. For interim years (e.g., 2021-2024, 2026-2029), potable and <br />recycled water demands are linearly interpolated between the values shown in Table 7-5. <br />Table 7-6. Multiple Dry Years Supply and Demand Comparison (DWR Table 7-4 Retail) <br />*Units of measure (AF, CCF, MG) must remain consistent throughout the UWMP as reported in Table 2-3. <br />NOTES: Volumes are in AF and include both recycled and potable water. <br />WEST YOST 7-10 City of Pleasanton <br />2020 Urban Water Management Plan <br />May 2021 <br />2045* <br />2025* <br />I 2030* <br />I 2035* <br />I 2040* <br />I <br />(Opt) <br />(Supply totals <br />18,240 <br />18,889 <br />19,387 <br />20,036 <br />20,036 <br />First year <br />(Demand totals <br />18,240 <br />18,889 <br />19,387 <br />20,036 <br />20,036 <br />Difference <br />0 <br />I 0 <br />I 0 <br />I 0 <br />I 0 <br />Supply totals <br />18,370 <br />18,988 <br />19,517 <br />20,036 <br />20,036 <br />Second year <br />(Demand totals <br />18,370 <br />18,988 <br />19,517 <br />20,036 <br />20,036 <br />Difference <br />0 <br />I 0 <br />+ <br />I 0 <br />I 0 <br />+ <br />I 0 <br />Supply totals <br />18,499 <br />19,088 <br />19,647 <br />20,036 <br />20,036 <br />Third year <br />(Demand totals <br />18,499 <br />19,088 <br />19,647 <br />20,036 <br />20,036 <br />Difference <br />0 <br />I 0 <br />I 0 <br />I 0 <br />I 0 <br />Supply totals <br />18,629 <br />19,188 <br />19,776 <br />20,036 <br />20,036 <br />Fourth year <br />(Demand totals <br />18,629 <br />19,188 <br />19,776 <br />20,036 <br />20,036 <br />Difference <br />0 <br />I 0 <br />I 0 <br />0 <br />0 <br />Supply totals <br />18,759 <br />19,287 <br />19,906 <br />20,036 <br />20,036 <br />Fifth year <br />(Demand totals <br />18,759 <br />19,287 <br />19,906 <br />20,036 <br />20,036 <br />(Difference <br />0 <br />I 0 <br />I 0 <br />I 0 <br />I 0 <br />*Units of measure (AF, CCF, MG) must remain consistent throughout the UWMP as reported in Table 2-3. <br />NOTES: Volumes are in AF and include both recycled and potable water. <br />WEST YOST 7-10 City of Pleasanton <br />2020 Urban Water Management Plan <br />May 2021 <br />