My WebLink
|
Help
|
About
|
Sign Out
14 ATTACHMENT 1 EXHIBIT A
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
060121
>
14 ATTACHMENT 1 EXHIBIT A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2021 1:11:04 PM
Creation date
5/20/2021 4:52:18 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/1/2021
DESTRUCT DATE
15Y
Document Relationships
14
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2021\060121
14 ATTACHMENT 1 EXHIBIT B
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2021\060121
14 ATTACHMENT 1 EXHIBIT C
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2021\060121
14 ATTACHMENT 1 EXHIBIT D
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2021\060121
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF <br />Chapter 7.: , _, � .. <br />Water Service Reliability and Drought Risk Assessment PL£ASANTON <br />7.1.4 Water Management Tools and Options <br />The City and Zone 7 coordinate to increase regional supply reliability and reduce reliance on water <br />imports. The City focuses on demand reduction, specifically prioritizing water conservation and <br />encouraging recycled water use. Zone 7 supports these efforts by the City while also evaluating new supply <br />options (including potable reuse and brackish water desalination) and optimizing and expanding <br />local storage. <br />In addition, Zone 7 is a member of the Bay Area Regional Reliability (BARR) partnership, which brings <br />together eight Bay Area water agencies to improve regional water supply reliability. Besides Zone 7, these <br />agencies include ACWD, SFPUC, the Bay Area Water Supply and Conservation Agency (BAWSCA), CCWD, <br />EBMUD, Marin Municipal Water District (MMWD), and VW. The BARR partners have agreed to work <br />cooperatively to address water supply reliability concerns and drought preparedness on a mutually <br />beneficial and regionally focused basis. Near- and long-term joint water supply reliability projects may be <br />evaluated through BARR, such as use of the capacity of existing facilities, changes to infrastructure <br />(including new interties, recycled water, water conservation, expanded treatment, regional desalination, <br />and water transfers and exchanges), and other projects or institutional arrangements that encourage a <br />regional approach to achieving water supply reliability in the Bay Area. <br />As part of its existing CIP, Zone 7 is planning to construct a reliability intertie with another major water <br />agency (e.g., EBMUD or SFPUC) to help mitigate some of the risk during a major water supply interruption <br />from the Delta and to create opportunities for transfers/exchanges. This intertie could allow Zone 7 to <br />acquire emergency water supplies to help meet minimum health and safety water supply needs during a <br />major Delta outage, assuming the partnering agency has available supply and the transmission capacity <br />available during the emergency period. A conceptual 24- to 30 -inch diameter intertie with EBMUD could <br />connect to the west side of Zone 7's transmission system and convey up to 10 to 15 MGD of supply. <br />Additional wells would also increase access to local groundwater and improve its management, while a <br />new booster pump station would improve conveyance of groundwater across the Tri -Valley. The new <br />Chain of Lakes Pipeline would allow for access to water stored locally in the Chain of Lakes. <br />7.2 DROUGHT RISK ASSESSMENT <br />In accordance with CWC Section 10612, urban water suppliers must conduct a DRA, which evaluates the <br />risk of a severe drought occurring for the next five consecutive years (2021-2025). Supply conditions for <br />the DRA are based on the five driest consecutive years on record, with adjustments to consider plausible <br />changes in climate, regulations, and other locally applicable criteria. <br />This section reviews the data and methods used to define the DRA water shortage condition and evaluates <br />each water source's reliability under the proposed drought condition. Finally, total water supplies during <br />the five-year drought are compared to projected demands, accounting for any applicable supply <br />augmentation or demand reduction measures available to the City. <br />7.2.1 Data, Methods, and Basis for Water Shortage Condition <br />The water shortage condition for the DRA is the same as the five-year drought presented in Section 7.1.2. <br />Since the DRA can be updated outside of the five-year UWMP cycle, a summary of the data and basis for <br />the water shortage condition is provided in this section. <br />WEST YOST <br />7-11 <br />City of Pleasanton <br />2020 Urban Water Management Plan <br />May 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.