Laserfiche WebLink
Chapter 8 <br />Water Shortage Contingency Plan <br />THE CITY OF <br />PL£ASANTON. <br />The City's has implemented efforts in addressing its facilities' seismic vulnerabilities. In accordance with <br />America's Water Infrastructure Act (AWIA), the City completed a Risk and Resilience Assessment (RRA) of <br />its water system in December 2020. The RRA systematically evaluated the City's assets, threats, and risks, <br />as well as countermeasures that might be implemented to minimize overall risk to the system. To ensure <br />the security of the City's water system, the RRA is retained by the City as a confidential document. <br />8.4 WATER SHORTAGE CONTINGENCY PLAN ADOPTION, SUBMITTAL, <br />AND AVAILABILITY <br />This WSCP (Appendix K) is adopted concurrently with the City's 2020 UWMP, by separate resolution. A <br />copy of the resolution is included in Appendix L. Prior to adoption, a duly noticed public hearing was <br />conducted. A copy of the WSCP will be submitted to DWR within 30 days of adoption. <br />No later than 30 days after submittal to DWR, copies of this WSCP will be available at the City's Operations <br />Service Center and the Pleasanton Public Library. Copies will also be provided to Alameda County and <br />Zone 7. An electronic copy of the WSCP will also be available for public review and download on the <br />City's website. <br />The City's WSCP is an adaptive management plan and is subject to refinements as needed to ensure that the <br />City's shortage response actions and mitigation strategies are effective and produce the desired results. <br />When a revised WSCP is proposed, the revised WSCP will undergo the process described in this section for <br />adoption by the City Council and distribution to Alameda County, Zone 7, and the general public. <br />WEST YOST 8-3 city of Pleasanton <br />2020 Urban Water Management Plan <br />May 2021 <br />N-680-60-20-04- W P -R -680-2020U W M P <br />