Laserfiche WebLink
ZONE 7 <br />ALAMEDA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT <br />BOARD OF DIRECTORS <br />RESOLUTION NO I3-4230 <br />INTRODUCED BY DIRECTOR QUIGLEY <br />SECONDED BY DIRECTOR STEVENS <br />Water Supply Reliability Policy <br />WHEREAS, the Zone 7 Board of Directors desires to maintain a highly reliable <br />Municipal and Industrial (M&I) water supply system so that existing and future M&I water <br />demands can be met during varying hydrologic conditions; and <br />WHEREAS, the Board has an obligation to communicate to its M&I customers and <br />municipalities within its service area the ability of Zone 7's water supply system to meet <br />projected water demands; and <br />WHEREAS, the Board on August 18, 2004 adopted Resolution No. 04-2662 setting forth <br />its Reliability Policy for Municipal & Industrial Water Supplies; and <br />WHEREAS, the Board desires to revise the Reliability Policy to reflect recent data, <br />analysis, and studies. <br />NOW, THEREFORE, BE IT RESOLVED that the Board hereby rescinds Resolution No. <br />04-2662 adopting the August 18, 2004 Reliability Policy for Municipal & Industrial Water <br />Supplies; and <br />BE IT FURTHER RESOLVED that the Board hereby adopts the following level of service goals <br />to guide the management of Zone 7's M&I water supplies as well as its Capital Improvement <br />Program (CIP): <br />Goal i . Zone 7 will meet its treated water customers' water supply needs, in accordance with <br />Zone 7's most current Contracts for M&I Water Supply, including existing and projected <br />demands as specified in Zone 7's most recent Urban Water Management Plan (UWMP), during <br />normal, average, and drought conditions, as follows: <br />• At least 85% of M&I water demands 99% of the time <br />a 100% of M&I water demands 90% of the time <br />Goal 2:Provide sufficient treated water production capacity and infrastructure to meet at least <br />80% of the maximum month M&I contractual demands should any one of Zone 7's major <br />supply, production, or transmission facilities experience an extended unplanned outage of at least <br />one week. <br />