My WebLink
|
Help
|
About
|
Sign Out
14 ATTACHMENT 1 EXHIBIT B
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
060121
>
14 ATTACHMENT 1 EXHIBIT B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2021 1:11:17 PM
Creation date
5/20/2021 5:04:58 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/1/2021
DESTRUCT DATE
15Y
Document Relationships
14
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2021\060121
14 ATTACHMENT 1 EXHIBIT A
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2021\060121
14 ATTACHMENT 1 EXHIBIT C
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2021\060121
14 ATTACHMENT 1 EXHIBIT D
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2021\060121
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BE IT FURTHER RESOLVED that to ensure that this Board policy is carried out <br />effectively, the Zone 7 General Manager will provide a water supply status report to the Board <br />every five years with the Zone 7 Urban Water Management Plan that specifies how these goals <br />will be, or are being, achieved. <br />If the General Manager finds that the goals cannot be met during the first five years of the <br />Urban Water Management Plan, then the Board will hold a public hearing within two months of <br />the General Manager's finding to consider remedial actions that will bring Zone 7 into <br />substantial compliance with the stated level of service goals. Remedial actions may include, but <br />are not limited to, voluntary conservation or mandatory rationing to reduce water demands, <br />acquisition of additional water supplies, and/or a moratorium on new water connections. After <br />reviewing staff analyses and information gathered at the public hearing, the Board shall, as <br />expeditiously as is feasible, take any additional actions that are necessary to meet the level of <br />service goals during the following five-year period; and <br />BE IT FURTHER RESOLVED that the Zone 7 General Manager shall prepare an <br />Annual Review of the Sustainable Water Supply Report which includes the following <br />information: <br />(1) An estimate of the current annual average water demand for M&I water as well as <br />a five-year projection based on the same information used to prepare the UWMP <br />and CIP; <br />(2) A Summary of available water supplies to Zone 7 at the beginning of the calendar <br />year; <br />(3) A comparison of current water demand with the available water supplies; and <br />(4) A discussion of water conservation requirements and other long-term supply <br />programs needed to meet Zone 7 M&I water demands for single -dry and multiple - <br />dry year conditions, as specified in the Zone 7's UWMP_ <br />A summary of this review will be provided to M&I customers. <br />Definitions <br />Level of Service for Annual Water Supply Needs the level of service is the percent of existing or <br />projected water demand that Zone 7's water supply system can meet during two key conditions: <br />(1) during various hydrologic conditions and (2) during unplanned outages of major facilities. <br />Capital Improvement Program (CIP)—the CIP is Zone7's formal program for developing <br />surface and ground water supplies, along with associated infrastructure, including import water <br />conveyance facilities, surface water treatment plants, groundwater wells, and M&I water <br />transmission system to meet projected water demands. <br />
The URL can be used to link to this page
Your browser does not support the video tag.