My WebLink
|
Help
|
About
|
Sign Out
RES 211231 Exhibit A
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2021
>
RES 211231 Exhibit A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2021 4:00:01 PM
Creation date
6/21/2021 3:40:58 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/15/2021
DESTRUCT DATE
PERMANENT
Document Relationships
RES 211231
(Attachment)
Path:
\CITY CLERK\RESOLUTIONS\2020-present\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Checklist and City of Pleasanton–10x Genomics Project <br />Environmental Evaluation Initial Study/Mitigated Negative Declaration <br /> <br /> <br />94 FirstCarbon Solutions <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480024/ISMND/wp/21480024 10x Genomics Project Full Screencheck ISMND.docx <br />a) Violate any water quality standards or waste discharge requirements or otherwise substantially <br />degrade surface or groundwater quality? <br />Less than significant impact. A significant impact may occur if a project discharges water that does <br />not meet the quality standards of agencies that regulate surface water quality and water discharges <br />into stormwater drainage systems. Water quality within the City of Pleasanton is regulated by the <br />San Francisco Bay RWQCB. <br />The proposed project would include ground-disturbing activities such as grading and excavation <br />during project construction. These activities have the potential to result in erosion, sedimentation, <br />and runoff, which could adversely affect water quality during construction. Improperly managed <br />construction activities can lead to substantially accelerated rates of erosion that are considered <br />detrimental to the environment. <br />The NPDES Program was established through the federal Clean Water Act to control and reduce <br />pollutant discharges to surface water bodies. Construction activities, including grading, that would <br />result in the disturbance of 1 acre or more would require compliance with the General Permit for <br />Storm Water Discharges Associated with Construction and Land Disturbance Activity (Construction <br />General Permit). The proposed project is 14.75 acres and would therefore be required to comply <br />with the Construction General Permit. The California State Water Resources Control Board (State <br />Water Board) adopted a requirement for obtaining an NPDES Construction General Permit. To obtain <br />coverage under the Construction General Permit, a project Applicant must submit a Notice of Intent <br />and a SWPPP. Activities subject to the Construction General Permit include clearing, grading, and <br />ground disturbance. The purpose of the SWPPP is to identify the sources of sediment and other <br />pollutants that could affect the quality of stormwater discharges and to describe and implement <br />BMPs to reduce or eliminate sediment and other pollutants in stormwater and non-stormwater <br />discharges resulting from construction activities. <br />As mentioned in Section 2.7, Geology and Soils, the proposed project would comply with the NPDES <br />Program and would obtain coverage under the Construction General Permit and implement a SWPPP <br />and BMPs to control and reduce pollutant discharges to surface water bodies. Additionally, the <br />proposed project would be subject to the RWQCB’s Municipal Regional Permit (MRP), implemented <br />in October 2009 by Order R2-2009-0074, and updated in November 2015 by Order R2-2015-0049. <br />Because the proposed project would include new impervious surfaces greater than 10,000 square <br />feet, the proposed project would be a C.3 Regulated Project. Under the C.3 requirements, the <br />proposed project would be required to prepare and submit a Stormwater Control Plan (SCP) that <br />discusses the design elements and implementation measures necessary to meet the post- <br />construction stormwater control requirements of the MRP. Under the C.3 Permit, the proposed <br />project would include appropriate site design measures and source controls and hydraulically sized <br />stormwater treatment measures, as well as Low Impact Development (LID) measures. <br />Site design measures would include directing runoff onto vegetated areas and maximizing <br />permeability through site design. Source control measures would include signage for inlets, drainage <br />plumbed to storm water treatment facilities, efficient irrigation, minimization of pesticides and <br />fertilizers, and covered trash enclosures. Construction BMPs would include measures such as
The URL can be used to link to this page
Your browser does not support the video tag.