Laserfiche WebLink
City of Pleasanton–10x Genomics Project Environmental Checklist and <br />Initial Study/Mitigated Negative Declaration Environmental Evaluation <br /> <br /> <br />FirstCarbon Solutions 95 <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480024/ISMND/wp/21480024 10x Genomics Project Full Screencheck ISMND.docx <br />temporary erosion controls, sediment control, runoff diversion, vegetative buffers, designated and <br />contained vehicle maintenance areas, training and instruction for employees and subcontractors, <br />and pollutant prevention and control. Additionally, the proposed project would include bioretention <br />areas. <br />According to the Illustrative Storm Water Quality Control Plan prepared for Phase 1 of the proposed <br />project (Appendix G), interceptor trees would be used in combination with bioretention areas for <br />stormwater and pollutant control pursuant to the guidance in the Alameda Countywide Clean Water <br />Program’s C.3 Stormwater Technical Guidance Manual. According to the Guidance Manual, <br />interceptor trees can reduce runoff and pollution by intercepting stormwater and retaining captured <br />water and can be used as part of Storm Water Control Plan (SCP).69 <br />Compliance with the C.3 Permit, the SWPPP, and implementation of BMPs, would ensure that the <br />proposed project would not result in substantial soil erosion that would violate water quality standards <br />or waste discharge requirements or otherwise substantially degrade surface or groundwater quality <br />during the construction or operation of the proposed project. Therefore, impacts would be less than <br />significant. <br />b) Substantially decrease groundwater supplies or interfere substantially with groundwater <br />recharge such that the project may impede sustainable groundwater management of the basin? <br />Less than significant impact. The proposed project would not result in a net increase of impervious <br />surfaces in areas previously penetrable for groundwater recharge purposes. Furthermore, the <br />proposed project would not require the use of groundwater. The City of Pleasanton has an <br />agreement with Zone 7 that allows the City to pump up to 3,500 acre-feet per year from three <br />groundwater wells owned and operated by the City. Local water is extracted from the Livermore <br />Valley Main Groundwater Basin. The City’s groundwater wells provide about 20 percent of the City’s <br />water supply; the remaining 80 percent is purchased from Zone 7.70 Because the proposed project <br />would not exceed the projected water supplies (see Section 2.18, Utilities and Public Services), the <br />proposed project would not cause overdraft of the groundwater supply. Therefore, the proposed <br />project would not substantially decrease groundwater supplies, interfere with groundwater <br />recharge, or impede sustainable groundwater management of the Livermore Valley Main <br />Groundwater Basin. Impacts would be less than significant. <br />c) Substantially alter the existing drainage pattern of area, including through the alteration of the <br />course of a stream or river or through the addition of impervious surfaces, in a manner which <br />would: <br />(i) result in substantial erosion or siltation on- or off-site; <br /> <br />69 Alameda Countywide Clean Water Program. 2019. C.3 Stormwater Technical Guidance Manual. September. Website: <br />https://cleanwaterprogram.org/businesses/development.html <br />70 City of Pleasanton. 2016. 2015 Urban Water Management Plan. June. Website: <br />http://admin.cityofpleasantonca.gov/civicax/filebank/blobdload.aspx?BlobID=28207. Accessed March 11, 2021.