Laserfiche WebLink
Environmental Checklist and City of Pleasanton–10x Genomics Project <br />Environmental Evaluation Initial Study/Mitigated Negative Declaration <br /> <br /> <br />96 FirstCarbon Solutions <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480024/ISMND/wp/21480024 10x Genomics Project Full Screencheck ISMND.docx <br />Less than significant impact. A significant impact may occur if a project results in a substantial <br />alteration of drainage patterns that would result in a substantial increase in erosion or siltation <br />during construction or operation of the project. <br />At Phase 1 buildout, the proposed project would have a total of 245,059 square feet of impervious <br />areas, 125,397 square feet of landscaped area, and 370,456 square feet of drainage management <br />area (DMA) divided into seven drainage sub-management areas and six bioretention areas. DMA 06 <br />would rely on interceptor tree credits rather than a bioretention area. The bioretention areas would <br />cover 10,051 square feet, which would exceed the 9,802 square feet of bioretention required per C.3 <br />guidance, and the interceptor tree credits equate to 44,451 square feet of treatment area thus <br />exceeding the required 44,100 square feet. <br />At full buildout, the proposed project would include a total of 400,973 square feet of impervious <br />areas, 234,380 square feet of landscaped area, and 635,353 square feet of drainage management <br />area divided into eight drainage management areas and eight bioretention areas. The bioretention <br />areas would cover 18,657 square feet, which would exceed the 16,039 square feet of bioretention <br />required per C.3 guidance. <br />As previously discussed in this section, the proposed project would comply with the C.3 Permit and <br />the SWPPP, and would implement BMPs to reduce runoff and pollution; these measures would also <br />prevent erosion and siltation. Furthermore, as discussed in Section 2.7, Geology and Soils, the <br />proposed project would be required to comply with the current CBC and with City Municipal Code <br />requirements pertaining to grading and excavation in effect at the time of project approval. The <br />proposed project would also be required to comply with the policies in the Public Safety Element of <br />the General Plan designed to minimize the risk of soil erosion and further mitigate its effects, <br />including Goal 1 Policy 2, which requires implementation of soils engineering and construction <br />standards.71 <br />With implementation of the SWPPP and BMPs and compliance with the General Plan Safety <br />Element, the proposed project would not alter the drainage patterns such that substantial erosion or <br />siltation would occur. Impacts would be less than significant. <br />(ii) substantially increase the rate or amount of surface runoff in a manner which would result <br />in flooding on- or off-site; <br />Less than significant impact. The proposed project would install an on-site storm drainage system. <br />Implementation of BMPs as previously discussed, such as efficient irrigation systems, minimization of <br />impervious areas, and bioretention treatment areas, would ensure that the proposed project would <br />not contribute to surface runoff that could result in flooding. Therefore, the proposed project would <br />not substantially increase surface runoff on the project site. Impacts would be less than significant. <br /> <br />71 City of Pleasanton. 2009. Pleasanton General Plan 2005-2025, Chapter 5, Public Safety Element. Website: <br />https://www.cityofpleasantonca.gov/civicax/filebank/blobdload.aspx?BlobID=23899. Accessed February 2, 2021.