Laserfiche WebLink
City of Pleasanton–10x Genomics Project Environmental Checklist and <br />Initial Study/Mitigated Negative Declaration Environmental Evaluation <br /> <br /> <br />FirstCarbon Solutions 129 <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480024/ISMND/wp/21480024 10x Genomics Project Full Screencheck ISMND.docx <br />need to generate no more than 12.9 VMT per employee if the East Planning Area average is selected as <br />the target (0.85 of 15.2) or 13.5 VMT per employee if the Alameda County average is selected as the <br />target (0.85 of 15.9). Based on the East Planning Area maps, the Travel Analysis Zone (TAZ) that is <br />project is within generates an average of 11.71 VMT per employee. This is an indication of the <br />expected VMT per employee associated with the proposed project. All other employment TAZs in the <br />general project area generate less than 12.54 VMT per employee. Thus, the proposed project passes <br />screening Criteria 2 and may be presumed to have a less than significant impact on VMT. <br />Criteria 3: The project site is within 0.5-mile of the West Pleasanton BART Station, as well as existing <br />bus stops on Stoneridge Mall Road and Springdale Avenue, which qualifies as a high-quality transit <br />corridor. Additionally, the proposed project would: <br />• Have an FAR of greater than 0.75; <br />• Provide 1,190 parking spaces for an estimated 1,415 employees, which corresponds to 0.84 <br />spaces per employee, assuming employees would work alternating schedules. The City of <br />Pleasanton’s Municipal Code Section 18.88.030 (Schedule of Off-Street Parking Space <br />Requirements) indicates that the Zoning Administrator and/or Planning Commission shall <br />establish parking requirements on a case-by-case basis for projects in a zoned CR-District. <br />• Be consistent with the Metropolitan Transportation Commission’s Sustainable Communities <br />Strategy; and <br />• Would not replace any affordable residential units. <br /> <br />Therefore, the proposed project also meets Criterion 3. <br />Based on the screening criteria, as well as the proposed project’s location and proximity to high- <br />quality transit, impacts would be less than significant impact pertaining to VMT. <br />c) Substantially increase hazards due to a geometric design feature (e.g., sharp curves or dangerous <br />intersections) or incompatible uses (e.g., farm equipment)? <br />Less than significant impact with mitigation incorporated. The proposed project would be <br />constructed to meet existing City design standards. Access to the project site would be provided <br />from three driveways, one on Springdale Avenue, one on Stoneridge Mall Road (north), and one on <br />Stoneridge Mall Road (east). The site is currently served by four driveways; with the project, the <br />existing northeastern driveway would be removed. <br />Based on the conceptual site plan for Phase 1 of the proposed project, the eastern driveway on <br />Stoneridge Mall Road into the project site is shown to be decommissioned. To minimize disruptions to <br />the pedestrian travel way during subsequent phases of construction, the proposed project would <br />construct the decommissioned project driveway at Stoneridge Mall Road to its ultimate <br />width/dimensions, including curb ramps during Phase 1. Additionally, barriers would be provided to <br />prevent vehicles from entering into the area during Phase 1. <br />The intersection of Springdale Avenue at the Project Driveway operates within an acceptable LOS as <br />an all-way stop intersection through project buildout. The proposed project would provide one