Laserfiche WebLink
Environmental Checklist and City of Pleasanton–10x Genomics Project <br />Environmental Evaluation Initial Study/Mitigated Negative Declaration <br /> <br /> <br />130 FirstCarbon Solutions <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480024/ISMND/wp/21480024 10x Genomics Project Full Screencheck ISMND.docx <br />inbound lane and two outbound lanes. The two outbound lanes would be configured as left and <br />through-right. Under MM TRANS-2, operations would be required to be monitored after completion <br />of Phase 1 and before project buildout to determine if the through-right lane should be reconfigured <br />as a left-through-right lane. With a left-turn and a left-through-right lane, additional intersection <br />improvements to accommodate the dual left would be required, including signalization to better <br />allocate right-of-way and improve pedestrian safety. All conduit and other infrastructure for a signal <br />should be constructed as a part of Phase 1 to minimize future disruptions to people walking, <br />bicycling and driving (MM TRANS-1). As such, impacts would be less than significant with mitigation <br />incorporated. <br />d) Result in inadequate emergency access? <br />Less than significant impact with mitigation incorporated. The project site is in an existing <br />developed portion of the City of Pleasanton and would not change the location of emergency <br />facilities. The site access is proposed from three existing driveways that would not be marginally <br />changed with implementation of the proposed project. All project driveways would serve as access <br />points for emergency vehicles. Project driveways are proposed to be at least 20-feet wide, and the <br />internal drive aisles are proposed to be at least 24-feet wide. While these dimensions meet <br />regulations for emergency vehicle widths, an emergency vehicle turning movement assessment is <br />recommended to ensure the adequate vehicle has been designed for and would be provided full <br />access to the project site. Additionally, the Applicant would be required to provide emergency <br />vehicle turning movement analysis that demonstrates the ability of a standard LPFD Fire Truck to <br />maneuver through the project site under MM TRANS-4. As such, the proposed project would provide <br />adequate emergency access with mitigation incorporated. <br />Mitigation Measures <br />MM TRANS-1 The Applicant shall modify the intersection of Stoneridge Drive at Springdale Avenue <br />to convert the existing southbound through and left turn lane into a left turn only <br />lane and convert the southbound right turn only lane into a through and right turn <br />lane. In addition, the eastbound left turn pocket shall be required to be extended to <br />provide 200 feet of vehicle storage. The Applicant shall install a conduit for a future <br />traffic signal at the intersection of Springdale Avenue at the Project Driveway for <br />Phase 1 of the proposed project. The City’s Traffic Engineering Division shall monitor <br />delays and queuing at the intersection. The installation of a traffic signal by the <br />Applicant in conjunction with the City shall be required prior to the buildout of <br />Phase 2. <br />MM TRANS-2 The City’s Traffic Engineering Division shall monitor and manage traffic signal timings <br />on Stoneridge Mall Road Drive between Stoneridge Mall Road and Springdale <br />Avenue Foothill Road and I-680 Northbound ramps to better coordinate travel flows <br />through the corridor and minimize vehicle queue spillback. This requirement <br />includes any necessary upgrading of traffic signal controller equipment and timing <br />on Stoneridge Drive between Foothill Road and the I-680 Northbound Ramps to <br />better coordinate travel flows through the corridor and minimize vehicle queue