My WebLink
|
Help
|
About
|
Sign Out
RES 211231 Exhibit A
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2021
>
RES 211231 Exhibit A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2021 4:00:01 PM
Creation date
6/21/2021 3:40:58 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/15/2021
DESTRUCT DATE
PERMANENT
Document Relationships
RES 211231
(Attachment)
Path:
\CITY CLERK\RESOLUTIONS\2020-present\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Checklist and City of Pleasanton–10x Genomics Project <br />Environmental Evaluation Initial Study/Mitigated Negative Declaration <br /> <br /> <br />134 FirstCarbon Solutions <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480024/ISMND/wp/21480024 10x Genomics Project Full Screencheck ISMND.docx <br />treatment requirements are exceeded. The City of Pleasanton provides its own sewage collection <br />facilities within the City limits. The DSRSD provides wastewater treatment services under contract <br />with the City. The LAVWMA—a joint powers agency between the City of Pleasanton, City of <br />Livermore, and the DSRSD—provides export/treated wastewater disposal services for treated <br />sewage effluent.115 Wastewater from the proposed project would consist mostly of effluent typical <br />of the commercial and office uses; packaging, warehousing, and distribution uses; as well as light <br />industrial uses such as R&D and light laboratory manufacturing uses of the proposed project and as <br />such would not substantially increase pollutant levels in the wastewater or exceed RWQCB <br />standards. The City of Pleasanton has an average annual wastewater flow of approximately 6 million <br />gallons per day (mgd), leaving 2.5 mgd of remaining capacity. <br />The City’s 2.5 mgd of remaining capacity would be sufficient to serve Pleasanton’s planned buildout <br />growth as anticipated in the General Plan.116 The wastewater that the proposed project would <br />generate would be consistent with General Plan buildout and would therefore be consistent with the <br />City’s remaining 2.5 mgd capacity and within the permitted capacity of the DSRSD. Additionally, the <br />proposed project would not exceed wastewater treatment requirements established by the RWQCB. <br />Therefore, impacts would be less than significant. <br />Stormwater <br />As discussed in Section 2.10, Hydrology and Water Quality, the proposed project would prepare and <br />implement a SWPPP with BMPs. Additionally, the proposed project would comply with the RWQCB’s <br />MRP and Provision C.3 requirements, which require preparation of an SCP. With implementation of <br />the SCP that was prepared for the proposed project, stormwater drainage would not be substantially <br />increased such that new or expanded facilities or relocation would be required. Therefore, impacts <br />would be less than significant. <br />Electric Power <br />PG&E provides electricity service to the City of Pleasanton and to the project site. The proposed <br />project would connect to the City’s existing electrical infrastructure and would be served by PG&E. <br />Impacts associated with electricity required by the proposed project are discussed in further detail in <br />Section 2.6, Energy. <br />Natural Gas <br />PG&E provides natural gas service to the project site. Impacts associated with natural gas required <br />by the proposed project are discussed in further detail in Section 2.6, Energy. <br />Telecommunications <br />Xfinity and AT&T would provide cable services to the proposed project. The proposed project would <br />connect to the existing telecommunications infrastructure. Therefore, the proposed project would <br /> <br />115 City of Pleasanton. 2015. Pleasanton Plan 2005–2025. January 6. <br />116 City of Pleasanton. 2009. Pleasanton Plan 2005-2025, Chapter 8 Water Element. Website: <br />https://www.cityofpleasantonca.gov/civicax/filebank/blobdload.aspx?BlobID=23911. Accessed March 11, 2021.
The URL can be used to link to this page
Your browser does not support the video tag.