My WebLink
|
Help
|
About
|
Sign Out
RES 211231 Exhibit A
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2021
>
RES 211231 Exhibit A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2021 4:00:01 PM
Creation date
6/21/2021 3:40:58 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/15/2021
DESTRUCT DATE
PERMANENT
Document Relationships
RES 211231
(Attachment)
Path:
\CITY CLERK\RESOLUTIONS\2020-present\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton–10x Genomics Project Environmental Checklist and <br />Initial Study/Mitigated Negative Declaration Environmental Evaluation <br /> <br /> <br />FirstCarbon Solutions 133 <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480024/ISMND/wp/21480024 10x Genomics Project Full Screencheck ISMND.docx <br />a) Require or result in the relocation or construction of new or expanded water, wastewater <br />treatment or stormwater drainage, electric power, natural gas, or telecommunications facilities, <br />the construction or relocation of which could cause significant environmental effects? <br />Less than significant impact. <br />Water <br />A significant impact may occur if a project would increase water consumption to such a degree that <br />the capacity of facilities currently serving the project site would be exceeded. Water for the City of <br />Pleasanton is supplied by Zone 7, which is predominantly sourced from the South Bay Aqueduct, <br />surface runoff collected in the Del Valle Reservoir, and local groundwater. Zone 7 has a current <br />sustainable water supply of about 86,100 acre-feet per year and manages a local groundwater basin <br />with a capacity of 240,000 acre-feet.111 As a water retailer, the City of Pleasanton provides potable <br />water service to businesses and homes within the City. <br />According to the General Plan Water Element, the current sustainable water supply is 86,100 acre- <br />feet per year. Zone 7 predicts a long-term demand throughout its service area of 82,313 acre-feet in <br />the year 2025, and maintains a 100 percent reliability policy for existing development for the next 20 <br />years through average, single dry, and multiple dry years. Accordingly, estimated demand can be <br />adequately served by existing and forecasted supplies. <br />The UWMP indicates that the City projected total water demand is a total of 20,167 acre-feet per <br />year by 2035 and 21,064 acre-feet per year by 2040.112 Thus, in the long-term, Zone 7 has sufficient <br />water to maintain full water deliveries through General Plan build-out of its customers—including <br />Pleasanton.113 According to the City of Pleasanton’s Water Master Plan Update, the water demand <br />factor for Industrial and Service developments is 0.09 gallons per day (gpd).114 Based on the demand <br />factor, the proposed project would create a demand for 34,295.58 gallons per day, or 38.42 acre-feet <br />per year. This is a conservative estimate based on the highest water demand rate for the land use <br />types that are proposed; therefore, the actual water demand of the proposed project would likely be <br />lower. The estimated water demand would represent less than 0.2 percent of the City’s projected <br />2040 total water demand, which is a nominal percentage of the City’s projected water demand. <br />The proposed project would be consistent with the General Plan and the City’s 2015 UWMP and <br />would utilize existing water facilities, therefore not requiring construction of new facilities or the <br />expansion of current facilities. Therefore, impacts would be less than significant. <br />Wastewater Treatment <br />A significant impact may occur if a project would increase wastewater generation to such a degree <br />that the capacity of facilities currently serving the project site would be exceeded, or if the RWQCB <br /> <br />111 City of Pleasanton. 2009. Pleasanton Plan 2005-2025, Chapter 8 Water Element. Website: <br />https://www.cityofpleasantonca.gov/civicax/filebank/blobdload.aspx?BlobID=23911. Accessed March 11, 2021. <br />112 City of Pleasanton. 2016. 2015 Urban Water Management Plan. June. Website: <br />http://admin.cityofpleasantonca.gov/civicax/filebank/blobdload.aspx?BlobID=28207. Accessed March 11, 2021. <br />113 City of Pleasanton. 2009. Pleasanton Plan 2005-2025, Chapter 8 Water Element. Website: <br />https://www.cityofpleasantonca.gov/civicax/filebank/blobdload.aspx?BlobID=23911. Accessed March 11, 2021. <br />114 City of Pleasanton. 2004. Water Distribution System Master Plan Update, November.
The URL can be used to link to this page
Your browser does not support the video tag.