Laserfiche WebLink
City of Pleasanton 10x Genomics Project Mitigation Monitoring and Reporting Program   FirstCarbon Solutions 11 https://adecinnovations.sharepoint.com/sites/ESSite/Shared Documents/ES/Active Projects/2148 City of Pleasanton/0024 10x Genomics/DOCUMENTS/01‐ ISMND/05 ‐ MMRP/21480024 10x Genomics MMRP.docx Mitigation Measures Method of Verification Timing of Verification Responsible for Verification Verification of Completion Date Initial recommendations set forth in the 2020 Geotechnical Investigation prepared by Langan Engineering and Environmental Services, Inc., dated December 3, 2020, for earthwork, foundation design, floor slabs, pavement and concrete flatwork design, and landscaping. Foundations and concrete flatwork shall be designed and constructed to resist the effects of expansive soil in accordance with the Geotechnical Investigation. construction plans; confirm submittal of documentation; conduct site inspection   issuance of construction permits MM GEO‐2: A qualified Paleontological Monitor should be present during all project related ground disturbance occurring 5 or more feet below ground surface that have the potential to impact undisturbed Pleistocene deposits. Should any significant paleontological resources (e.g., bones, teeth, well‐preserved plants) be unearthed, all construction activities shall be diverted at least 15 feet from the find until a professional Paleontologist has assessed it and, if deemed significant, salvaged the fossil in a timely manner. Collected fossils shall be deposited in an appropriate repository, where they will be properly curated and made available for future research. Confirm evidence that a qualified Paleontological Monitor has been contracted; confirm submittal of documentation During all project related ground disturbance occurring 5 or more feet below ground surface that have the potential to impact undisturbed Pleistocene deposits City of Pleasanton    2.8 Greenhouse Gas Emissions MM GHG‐1: Utilizing Energy Star® Certified Appliances Prior to the issuance of the certificate of occupancy for the proposed project, the project Applicant should provide the City with documentation that demonstrates the proposed project’s purchase and intended use of Energy Star® certified appliances including, but not limited to, refrigerators, dishwashers, vending machines, water coolers, heating and ventilation systems, and water heaters, where feasible. Review notes on construction plans; confirm submittal of documentation; conduct site inspection   Prior to the issuance of the certificate of occupancy City of Pleasanton    2.9 Hazards and Hazardous Materials MM HAZ‐1: Prior to the issuance of grading permits, the project Applicant shall provide evidence of soil testing within Review notes on construction plans; Prior to the issuance of grading City of Pleasanton