Laserfiche WebLink
City of Pleasanton 10x Genomics Project Mitigation Monitoring and Reporting Program   FirstCarbon Solutions 12 https://adecinnovations.sharepoint.com/sites/ESSite/Shared Documents/ES/Active Projects/2148 City of Pleasanton/0024 10x Genomics/DOCUMENTS/01‐ ISMND/05 ‐ MMRP/21480024 10x Genomics MMRP.docx Mitigation Measures Method of Verification Timing of Verification Responsible for Verification Verification of Completion Date Initial the project boundary to confirm presence or absence of pesticide compounds (e.g., organochlorine pesticides). If hazardous levels of pesticide compounds are found, the project Applicant shall complete any residual soil remediation. In addition, if pesticides related to the former agricultural use of the site are found, a construction worker health and safety plan shall be prepared and shall be implemented during project construction. confirm submittal of documentation; conduct site inspection   permits MM HAZ‐2: Any wells that are encountered during project construction shall be abandoned in accordance with current guidance. The existing groundwater monitoring well shall be abandoned or relocated in coordination with Zone 7 as part of any future redevelopment. Review notes on construction plans; confirm submittal of documentation; conduct site inspection   During project construction City of Pleasanton, Zone 7 Water Agency   2.13 Noise MM NOI‐1: Implementation of the following multi‐part mitigation measure is required to reduce potential construction period noise impacts:  The construction contractor shall ensure that all equipment driven by internal combustion engines shall be equipped with mufflers, which are in good condition and appropriate for the equipment.  The construction contractor shall ensure that unnecessary idling of internal combustion engines (i.e., idling in excess of 5 minutes) is prohibited.  The construction contractor shall utilize “quiet” models of air compressors and other stationary noise sources where technology exists.  At all times during project grading and construction, the construction contractor shall ensure that stationary noise‐generating equipment shall be located as far as practicable from sensitive receptors and placed so that emitted noise Review notes on construction plans; confirm submittal of documentation; conduct site inspection   During the construction period City of Pleasanton