Laserfiche WebLink
City of Pleasanton 10x Genomics Project Mitigation Monitoring and Reporting Program   FirstCarbon Solutions 15 https://adecinnovations.sharepoint.com/sites/ESSite/Shared Documents/ES/Active Projects/2148 City of Pleasanton/0024 10x Genomics/DOCUMENTS/01‐ ISMND/05 ‐ MMRP/21480024 10x Genomics MMRP.docx Mitigation Measures Method of Verification Timing of Verification Responsible for Verification Verification of Completion Date Initial and separated bikeways in the long‐term. To the extent feasible, the long‐term improvements shall be constructed along the project frontage. Furthermore, the Applicant shall contribute to the construction of a Class IV facility on the eastside of Stoneridge Mall Road connecting Stoneridge Drive to the West Pleasanton BART Station. The Applicant shall construct bicycle and pedestrian improvements at the intersection of Stoneridge Mall Road at Fabian Court to improve access to the project site to/from the BART station. A Class IV facility shall construct along the south side of Stoneridge Mall Road from Springdale Avenue to Fabian Court. Bicycle and pedestrian improvements shall be constructed at the intersection of Springdale Avenue and Stoneridge Mall Road to provide safe and convenient access for nonmotorized travel across the intersection’s’ southern approach. MM TRANS‐4: The Applicant shall provide emergency vehicle turning movement analysis that demonstrates the ability of a standard LPFD fire truck to maneuver through project site. Review notes on construction plans; confirm submittal of documentation; conduct site inspection  During project construction City of Pleasanton