Laserfiche WebLink
The City has developed an updated GIS -based hydraulic model of the water distribution system <br />which is being used to identify any storage or conveyance deficiencies for current and future water <br />deliveries. Deficiencies will be addressed by either making changes to operating practices or by <br />developing and implementing new capital improvement projects. <br />[To be expanded as site inventory is developed and CEQA analysis is conducted] <br />Sewer <br />The City of Pleasanton owns and maintains the pipelines, manholes, force mains, pump stations, <br />and siphons in the local sewer collection system within the City's limits. Most of the City's existing <br />collection system is in satisfactory condition and operates in accordance with acceptable industry <br />standards for conveyance of average dry weather flows, peak hourly dry weather flows, and peak <br />wet weather flows during a generally acceptable storm event. The Pleasanton General Plan <br />adopted in 2009 identified the need for future improvements to the existing local collection and <br />pumping system. These improvements included the construction of new or parallel sewers; <br />diversion structures; and modifications, improvements, or complete reconstruction of various <br />pump stations. The General Plan also provides that maintaining and enhancing the existing local <br />sewer collection system will be funded as part of the City's Capital Improvement Program (CIP), <br />and new sewer lines will be funded and constructed by new development as it occurs. The City <br />anticipates conducting a sewer/wastewater capacity analysis in 2022. <br />Dublin -San Ramon Services District (DSRSD) provides Pleasanton's sewage treatment services. <br />Disposal of treated effluent from DSRSD's plant to the San Francisco Bay is provided by means <br />of disposal lines managed by LAVWMA (Livermore Amador Valley Water Management Agency), <br />a Joint Powers Authority (JPA) between the City of Pleasanton, the City of Livermore, and DSRSD. <br />A 2017 capacity evaluation of the DSRSD showed that the DSRSD Wastewater Treatment Plant <br />had spare capacity. Recent recycled water projects and conservation efforts for reuse of <br />wastewater within the Tri -Valley service area have helped to reduce impacts on treatment <br />capacity. <br />There are several known deficiencies within the sanitary sewer system in need of improvement. <br />These improvements are most likely to be undertaken as capital improvement program (CIP) <br />projects or as part of future development. Certain housing sites identified in the sites inventory <br />will require expansions and/or upsizing to the local sewer collection system to support housing <br />development. [To be expanded as site inventory is developed and CEQA analysis is conducted] <br />As required by Government Code §65589.7, in May 2008, the City adopted an administrative <br />policy to provide priority water and sewer service for housing developments serving lower income <br />households. <br />C-38 I City of Pleasanton Housing Constraints <br />