My WebLink
|
Help
|
About
|
Sign Out
18
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
110221
>
18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2021 2:59:07 PM
Creation date
10/27/2021 2:31:16 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/2/2021
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAP 2.0 Action Quantification Outcomes <br />Executive Summary <br />This document summarizes findings from a quantitative assessment of the prioritized shortlist of actions <br />for inclusion in the draft Pleasanton CAP 2.0. The quantitative assessment provides high-level estimates <br />of the costs and emission reductions associated with each action to provide a defensible plan for <br />meeting the City's emission reduction goals. Key findings of the analyses include: <br />• Modeling suggests that implementation of proposed CAP 2.0 measures could exceed the City's <br />proposed 2030 target (4.11 MTCO2e per capita) and SB -32 required reductions, resulting in <br />emissions that drop from 13.6 MTCO2e per capita in 1990 to 3.96 MTCO2e per capita in 2030. The <br />following CAP strategies and actions are the highest contributors of GHG emission reductions <br />through 2030: <br />o Carbon sequestration (Urban Forest Master Plan) <br />o Renewable electricity (Zero emissions as default EBCE choice) <br />o Vehicle decarbonization (ZEV Infrastructure Plan) <br />o Decarbonization of buildings (Existing Building Electrification Plan) <br />• Modeling suggests that the total net present value (NPV) City cost over the next ten years <br />through 2031 of implementing all the actions in the shortlist will be $23 million—equivalent to <br />around $2.3 million per year. <br />• The estimated NPV cost to the community over the next ten years through 2031 of <br />implementing all the actions in the shortlist is a net savings of $10 million—equivalent to <br />around $1 million in savings per year or $12 in annual savings per capita. Much of these savings <br />to the community are in the form of rebates/incentives and fuel cost savings. <br />• Implementing all the actions in the shortlist will require staff time, ranging from an estimated 5 <br />to 8.25 FTE per year through 2031. These FTE may be absorbed into existing staff duties or new <br />staff may be hired. The following actions have the highest total FTE estimated from 2022-2031: <br />o Bicycle, pedestrian, and trails network expansion <br />o Wildfire preparation, prevention, and education <br />o ZEV Infrastructure Plan <br />o VMT reduction for K-12 activities <br />o Urban Forest Master Plan <br />This document is organized as follows: <br />• The Overview introduces the approach and key assumptions that drove the analysis. <br />• The Findings Summary provides the emissions reductions, City staff time, NPV, and cost- <br />effectiveness for proposed CAP 2.0 actions. <br />• The remaining sections detail emissions reduction and cost results by sector: <br />• Buildings & Energy • Water Resources <br />• Materials & Consumption • Transportation & Land Use <br />• Natural Systems 0 Community Resilience & Wellbeing <br />• A detailed References list documents the sources used to conduct the analyses. <br />N <br />CASCADIA Page 2 <br />CONSULTING CROUP <br />
The URL can be used to link to this page
Your browser does not support the video tag.