Laserfiche WebLink
consistent with those approved on the Bernal Avenue Underpass <br />regarding width of ballast trough, as recommended by Office <br />of the Chief Engineer, WPRR, Omaha), for which the City has <br />received authority from the Commission and for which a <br />construction contract has been awarded by the City. To <br />facilitate the prompt and efficient design of the bridge <br />structure in light of previous approval of the Bernal Avenue <br />Underpass, WPRR agrees to a departure from its current policy <br />requiring steel bridge structures in this instance only and <br />this approval is not considered a precedent for any future <br />structures. <br />3. Railroad Cooperation. <br />a. Subject to the terms and conditions of said amended <br />or substitute PUC Application being consistent with the <br />provisions of this Memorandum of Understanding, railroads <br />will promptly advise the PUC that they have no objection to <br />an Order, valid for a term of six years, approving the City's <br />Application to Modify Decision 85-08-037 as shown in Exhibit <br />A attached hereto and made a part hereof. <br />b. SPTCo shall remove at its own cost two of the five <br />yard tracks at the proposed Busch Road public crossing during <br />the time of construction of the proposed Busch Road public <br />crossing. SPTCo at its own option and own cost may add an <br />approximately equal amount of trackage at the southerly end <br />of the east leg of the Radum Wye. City plans to build the <br />proposed Busch Road crossing as a sixty foot (601) road, but <br />ultimately plans to widen that crossing to one hundred feet <br />(1001). The track removal and modification by SPTCo shall <br />permit such future widening without necessitating further <br />switch modifications. The easements conveyed by SPTCo for <br />the proposed Busch Road crossing shall be one hundred feet <br />(100' ) in width. <br />C. Acceptable materials to be used at vehicular <br />crossings of the railroad shall include asphaltic concrete or <br />rubber. If SPTCo selects rubber crossing surface, then SPTCo <br />shall be responsible for the difference in cost between <br />asphaltic concrete and rubber. <br />4. Construction and Maintenance Agreement. At a later <br />date, Parties will enter into a Construction and Maintenance <br />Agreement (or agreements), in a form customarily utilized for <br />construction of new public crossings. It is understood that the <br />Construction and Maintenance Agreement shall contain a provision <br />in which the City agrees to release, defend, indemnify and hold <br />the railroads harmless from any claims by users or occupiers or <br />any third persons for injuries or damages resulting from any <br />negligent design for portions designed by City, its agents, <br />contractors or subcontractgrs. Each party shall agree to <br />indemnify and hold the others harmless from claims resulting from <br />its own negligent construction or maintenance of subject <br />improvements. <br />- 2 - <br />