My WebLink
|
Help
|
About
|
Sign Out
SOUTHERN PACIFIC - FT 034165
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
S
>
SOUTHERN PACIFIC - FT 034165
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2021 3:59:12 PM
Creation date
11/4/2021 3:57:03 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
3/23/1982
LONG TERM AGREEMENTS - NAME
SOUTHERN PACIFIC
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. Local agencies propose to build a north -south street on the east <br />side of the WP main line, between Rose Avenue and St. Mary's Street, to <br />provide for local traffic circulation which would otherwise be disrupted <br />by closure of the Division Street grade crossing, as shown on Exhibit F. <br />7. Local agencies plan to realign Sunol-Pleasanton Road at SP Crossing <br />No. D-38.3, which will be removed, to eliminate the sharp reverse curve <br />approaches thereto. <br />8. The above-described three grade separations, track relocations, <br />closure of existing grade crossings, and street and highway relocations <br />are hereinafter collectively referred to as the "Project." <br />9. The Project was established as No. 5 in the priority list of the <br />Public Utilities Commission in Decision No. 93160, O.I.I. No. 83. <br />The parties hereto desire to set forth in this document their <br />understanding and agreements relating to the Project, and the changes in <br />track layouts, street rjetwork, utilities and other relocated facilties <br />made necessary in connection therewith. <br />AGREEMENT <br />PART 1 - DESCRIPTION OF WORK <br />1. Following completion of the new South Verona Underpass (PUC No. 4- <br />37.2-B), the roadway approaches, and the Pleasanton-Sunol road realignment, <br />County will close the existing underpass to public motorized vehicular <br />traffic, and will remove existing superstructure. County reserves the <br />right to convert the existing underpass to a bicycle and pedestrian <br />structure by installing an 8 -ft. dia. corrugated metal pipe in the <br />opening between the two abutments, removing superstructure, and then <br />backfilling. <br />2. Following completion of the new separations at Bernal Avenue and <br />Del Valle Parkway, City of Pleasanton will take all necessary steps to <br />close to all public use the existing WP grade crossings at <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.