Laserfiche WebLink
6. Local agencies propose to build a north -south street on the east <br />side of the WP main line, between Rose Avenue and St. Mary's Street, to <br />provide for local traffic circulation which would otherwise be disrupted <br />by closure of the Division Street grade crossing, as shown on Exhibit F. <br />7. Local agencies plan to realign Sunol-Pleasanton Road at SP Crossing <br />No. D-38.3, which will be removed, to eliminate the sharp reverse curve <br />approaches thereto. <br />8. The above-described three grade separations, track relocations, <br />closure of existing grade crossings, and street and highway relocations <br />are hereinafter collectively referred to as the "Project." <br />9. The Project was established as No. 5 in the priority list of the <br />Public Utilities Commission in Decision No. 93160, O.I.I. No. 83. <br />The parties hereto desire to set forth in this document their <br />understanding and agreements relating to the Project, and the changes in <br />track layouts, street rjetwork, utilities and other relocated facilties <br />made necessary in connection therewith. <br />AGREEMENT <br />PART 1 - DESCRIPTION OF WORK <br />1. Following completion of the new South Verona Underpass (PUC No. 4- <br />37.2-B), the roadway approaches, and the Pleasanton-Sunol road realignment, <br />County will close the existing underpass to public motorized vehicular <br />traffic, and will remove existing superstructure. County reserves the <br />right to convert the existing underpass to a bicycle and pedestrian <br />structure by installing an 8 -ft. dia. corrugated metal pipe in the <br />opening between the two abutments, removing superstructure, and then <br />backfilling. <br />2. Following completion of the new separations at Bernal Avenue and <br />Del Valle Parkway, City of Pleasanton will take all necessary steps to <br />close to all public use the existing WP grade crossings at <br />3 <br />