My WebLink
|
Help
|
About
|
Sign Out
SOUTHERN PACIFIC - FT 034165
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
S
>
SOUTHERN PACIFIC - FT 034165
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2021 3:59:12 PM
Creation date
11/4/2021 3:57:03 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
3/23/1982
LONG TERM AGREEMENTS - NAME
SOUTHERN PACIFIC
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />d. The actual cost of work by Railroads' forces, subject to the <br />limitations set forth below. <br />(1) The cost right—of—way acquisition for permanent track <br />connections and for work performed by Railroads in constructing the <br />track connections, communications and signal changes described in paragraph <br />6, subparagraphs (a), (b), and (c), above, and eligible to be considered <br />as a part of the Project, shall be limited to a maximum of eight hundred <br />thousand dollars ($800,000). Any expenses incurred by Railroads in <br />excess of said amount in connection with said subparagraphs shall be <br />borne entirely by Railroads, and will not be subject to Project partici— <br />pation. All of the work described in paragraph 6, subparagraph (d) shall <br />be included in the Project cost without limitation. <br />(2) The work performed in paragraph 6, subparagraph (e),n^ <br />/conductor and engineer -pilots <br />involving inspectors, watchmen, and flagmen, will be eligibfor participation <br />from Project funds only insofar as such inspectors, watchmen, and flagmen <br />are directly involved in construction work at the three underpass sites <br />or at the temporary track connections described in paragraph 6, subparagraph <br />(d), above. <br />e. The actual cost of supplemental items and engineering applicable <br />to design and construction of the Project. <br />9. In full discharge of their obligations under Section 1202.5 of the <br />California Public Utilities Code, SP and WP, each agree to contribute <br />five percent, together totaling 10 percent, of the cost of said Project, <br />or eight hundred eighty thousand dollars ($880,000), whichever is less, <br />as provided for in the applicable subsections of Section 1202.5. <br />The cost of that portion of the Project to which Railroads shall <br />contribute is estimated at seven million eight hundred thousand dollars <br />($7,800,000). The five percent contributions will be calculated when <br />the actual final costs of the project are known. From these, there <br />shall be deducted the actual expenses incurred by the respective <br />M <br />
The URL can be used to link to this page
Your browser does not support the video tag.