Laserfiche WebLink
7. Local agencies shall submit to WP -for prior approval shop drawings <br />for all portions of the railroad bridge superstructures, and shall <br />furnish WP with copies of the concrete mix designs for said superstructure <br />(showing the component parts of the mix and the cylinder strength breaks <br />made in connection with the mix design), and of the results of the <br />cylinder strength breaks made during the progress of the work on the <br />bridge superstructure. Drawings delineating designs for shorings, <br />excavation bracings, falsework, etc., which the contractor may be required <br />to furnish and which may be adjacent to railroad structures or track <br />support embankment or in any way may affect the safety of railroad <br />operations shall be submitted to the WP for review to ascertain that the <br />designs are consistent with railroad design practice and loadings. The <br />local agencies shall forward the shop.plans or Contractor's designs, <br />etc., to the Railroad for review only after they have been reviewed and <br />approved by the local agency. The local agencies shall state in the <br />transmittal to the Railroad for review and concurrence that they have <br />reviewed and approved the plans. The local agencies shall furnish a <br />certification to the Railroad that plant manufactured precast concrete <br />units have been fabricated under inspection supervision by an Inspection <br />Agency which is under the direction and control of Registered Civil <br />Engineers. Upon completion of the project, local agency shall furnish <br />Railroad one set of mylars or 105 mm. negatives of the "As -built" plans <br />for the railroad bridges. <br />8. The cost of the Project shall include, but not be limited to: <br />a. Preliminary engineering, utility relocations, construction <br />engineering, appraisals, and related costs. <br />b. Costs of rights-of-way acquired by local agencies, as defined <br />in Part II, para. 5 of this Agreement. <br />C. The actual final quantities in the Project and the approaches <br />to the several grade separations, to which shall be applied the corresponding <br />unit prices contained in the construction contract or contracts. <br />0 <br />