My WebLink
|
Help
|
About
|
Sign Out
03
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
021522
>
03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 9:34:11 AM
Creation date
2/10/2022 9:27:21 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/15/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Emissions reduction 5,300 City Cost N/A <br />Co -benefits 0 At ro 1P U Community Cost N/A <br />The City will continue working with regional partners to support <br />the Valley Link project. This new rail line will connect the Bay Area <br />to northern San Joaquin County with seven new stops between the <br />Dublin/Pleasanton BART station and the North Lathrop ACE station. <br />Valley Link will increase connectivity to jobs, housing, and people <br />within the Tri Valley and beyond, and serve as a model of sustainability <br />in its design, construction, and operation. <br />Emissions reduction 1,000 City Cost N/A <br />Co -benefits fTta04?8; Community Cost N/A <br />The City will continue implementing the City's Complete Streets <br />program to ensure transportation improvemen projects include <br />multimodal elements and maintain safe and convenient street travel. <br />Primary Actions <br />Emissions reduction 1,900 City Coy $0 <br />Co -benefits "ut O Community Cost $2.4M <br />The City will update the PMC to require showers, lockers, changing <br />areas, bike parking, and protected bicycle storage for new commercial <br />developments of a certain size; and commercial, mixed-use, and multi- <br />family projects to install bicycle parking (consistent with the Bicycle & <br />Pedestrian Master Plan recommended programs 6.4.2 (2) and 6.6.2 (1)). <br />Emissions reduction 1,800 City Cost $8k <br />Co -benefits ;Q; O Community Cos_ ($777k) <br />The City will develop and implement a citywide bicycle rack request <br />program that receives requests from businesses and residents to <br />install bicycle racks free of charge on public property next to business <br />properties (consistent with the Bicycle & Pedestrian Master Plan <br />recommended policy 4-2). The City will maintain an inventory of <br />installed bicycle racks. <br />Emissions reduction 5,100 City Cost $75k <br />1 <br />Co -benefits W; Community Cost ($585k) <br />The City will partner with transit agencies (e.g., BART, ACE, and LAVTA) <br />to improve access across the city. Improving access across the city <br />should consider the following: <br />• Provide convenient connections to destinations throughout the city <br />(e.g., BART to Main Street and ACE to Hacienda). <br />• Provide connections between transit facilities and the bicycle and <br />trail network. <br />Ensure sufficient transit connections to higher -density areas that <br />currently have low or limited access to transit. <br />Enhance secure bicycle parking at transit stations and major bus <br />stops. <br />Pleasanton Climate Action Plan 2.0 Transportation & Land Use 144 <br />
The URL can be used to link to this page
Your browser does not support the video tag.