My WebLink
|
Help
|
About
|
Sign Out
14 ATTACHMENT 1-5
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
021522
>
14 ATTACHMENT 1-5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 11:41:13 AM
Creation date
2/10/2022 10:22:01 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/15/2022
DESTRUCT DATE
15Y
Document Relationships
14
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
14 ATTACHMENT 6 - Appendix A - E
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
14 ATTACHMENT 6 - Appendix F - I
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PUD-138 and Vesting Tentative Subdivision Map 8616 Planning Commission <br />22 of 28 <br />would be within 2 percent of the amount estimated in the 2018 TIA/Draft SEIR. For this <br />assessment, results from the 2018 Draft SEIR were used to evaluate the project’s potential <br />effect related to the City’s traffic operations thresholds. <br /> <br />Traffic Calming <br />Traffic calming measures have been discussed and evaluated in order to provide safer <br />roadways. The design of new traffic-calming measure and/or modification of the existing traffic- <br />calming measures along Alisal Street at Sycamore Road and at Alisal Court would be required <br />to be consistent with the rural nature of the roadway. The installation of new traffic-calming <br />measures (e.g. speed lumps) on Spotorno Ranch Drive would be consistent with the City’s <br />Neighborhood Traffic Calming Program. Staff has included a condition of approval to address <br />this item. <br /> <br />Pedestrian and Bicyclist Safety <br />Safety issues concerning pedestrians and bicyclists in the Happy Valley area , in general, have <br />been raised by area residents. As proposed, sidewalk and trails within the project area would <br />provide safe and expanded travel routes for use by both pedestrians and bicyclists. The <br />sidewalk and these trails would be constructed as part of the development. The proposed trail <br />on Alisal Street, a county street, and along Westbridge Lane, would improve the existing <br />condition for pedestrians when constructed. <br /> <br />Westbridge Lane <br />The western segment of Westbridge Lane is identified in the HVSP as the Golf Course <br />Emergency Vehicle Access (EVA). The HVSP requires the construction of a bypass road to <br />accommodate all of the traffic created by the golf course, homes at the golf course (Mariposa <br />Ranch), and development of the Spotorno propoerty. After the bypass road is constructed, the <br />HVSP anticipates the western end of Westbridge Lane would be closed (at approximately <br />2215 Westbridge Lane) to through traffic and used only for emergency vehicle access. <br /> <br />The bypass road is not part of the proposal. Hence, the applicant intends to leave Westbridge <br />Lane as it currently is configured, allowing for through vehicle traffic. The Fehr&Peers analysis <br />indicates there would be a 5 percent increase in cumulative weekday daily roadway segment <br />volumes on Westbridge Lane with the project. Staff finds this increase is minor; thus, retaining <br />Westbridge Lane as a through street is acceptable. <br /> <br />Geology and Soils <br />The project site is located within a California Earthquake Fault Hazard Zone for the Verona <br />Fault, which crosses the site adjacent to the eastern boundary of the proposed development <br />area by the proposed Lots 8-12. A Geotechnical Feasibility Report was prepared by Engeo in <br />2015 for development on the Spotorno Flat Area. The 2015 Engeo report indicates four <br />landslides along the eastern boundary of the proposed development. It does not appear that <br />structures will be located on slide areas, however, structures could be located near the to p of <br />the landslides risking damage to the structure. Engeo recommends repair of the identified <br />landslides. Engeo’s recommendations also include review of the final construction plans. Staff <br />has included conditions of approval to address these items. <br /> <br />Grading and Retaining Walls <br />The HVSP states grading should be limited as much as feasible, and where cuts and fills are <br />necessary, contour grading shall be used which blends new grades with existing grades.
The URL can be used to link to this page
Your browser does not support the video tag.