Laserfiche WebLink
City of Pleasanton–Spotorno Ranch Reduced Development Project <br />Environmental Checklist Initial Study/Consistency Checklist <br /> <br /> <br />106 FirstCarbon Solutions <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480021/Consistency Checklist/21480021 Spotorno Ranch Consistency Checklist ScreenCheck.docx <br />Environmental Issues <br />CEQA Section 15183(b) Criteria <br />Prior 1998 <br />HVSP FEIR <br />Determination <br />Effect <br />Peculiar to <br />Project or <br />Site? <br />New <br />Significant <br />Effect? <br />New <br />Significant <br />Off-site, <br />Cumulative <br />Impact? <br />New <br />Information, <br />More Severe <br />Adverse <br />Impact? <br />4.8 Greenhouse Gas Emissions <br />Would the project: <br />a) Generate greenhouse gas emissions, <br />either directly or indirectly, that may <br />have a significant impact on the <br />environment? <br />None No No No No <br />b) Conflict with any applicable plan, policy <br />or regulation of an agency adopted for <br />the purpose of reducing the emissions of <br />greenhouse gases? <br />None No No No No <br /> <br />a) Greenhouse Gas Emissions <br />Would the project: Generate greenhouse gas emissions, either directly or indirectly, that may have <br />a significant impact on the environment? <br />The 1998 HVSP FEIR did not address greenhouse gas (GHG) emissions. <br />The BAAQMD does not have a numerical threshold for construction-related GHG emissions, but does <br />recommend that these emissions are quantified and included in an impact analysis. Common <br />practice is to quantify construction-related GHG emissions, amortize them over an assumed 30-year <br />project lifetime, and add the amortized value to the operational GHG emissions estimate. <br />FCS evaluated GHG emissions for a 39-lot subdivision on the site in a 2018 DEIR, and compared them <br />to the BAAQMD bright-line significance threshold of 1,100 metric tons of carbon dioxide equivalent <br />(CO2e) per year (MT CO2e/year). The total emissions from operations, including the amortized <br />construction emissions, was 584 MT CO2e/year, which is below the BAAQMD significance threshold <br />(Emissions for a 22-lot subdivision, as is currently proposed, would be even lower). Details can be <br />found in Appendix B. This effect would not constitute new information, an additional or more severe <br />impact that was analyzed in the 1998 HVSP FEIR. <br />b) Greenhouse Gases Emissions Reduction Plan Conflict <br />Would the project: Conflict with any applicable plan, policy or regulation of an agency adopted for <br />the purpose of reducing the emissions of greenhouse gases? <br />The City of Pleasanton adopted a CAP in 2012. While the Pleasanton CAP does not currently meet <br />the requirements for being a Qualified GHG Reduction Plan per BAAQMD requirements, it did meet <br />the requirements in 2018 when the previous analysis was conducted.