Laserfiche WebLink
City of Pleasanton–Spotorno Ranch Reduced Development Project <br />Environmental Checklist Initial Study/Consistency Checklist <br /> <br /> <br />114 FirstCarbon Solutions <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480021/Consistency Checklist/21480021 Spotorno Ranch Consistency Checklist ScreenCheck.docx <br />As discussed in greater detail in Section 4.20, Wildfire, over 7,000 acres of the Pleasanton planning <br />area are identified as special fire protection areas. Grassland fires in California are easily ignited, <br />particularly in dry seasons. Wildfire is a serious hazard in undeveloped areas, particularly near areas <br />of natural vegetation and steep slopes since fires tend to burn more rapidly on steeper terrain. As <br />indicated in the General Plan, the project site is located in Happy Valley, which contracts with the <br />City of Pleasanton for Fire Protection.27 According to the California Department of Forestry and Fire <br />Protection (CAL FIRE) Fire Hazard Severity Zone maps, the project site is within a Moderate to High <br />Fire Hazard Zones in the State Responsibility Area (SRA).28 <br />As indicated in Section 3.10, Public Services, the proposed project would be adequately served by <br />the Pleasanton-Livermore Fire Protection District’s Fire Station 4, which is located northwest of the <br />project site. As discussed previously, the proposed residences would incorporate tile or other fire- <br />resistant roofing to minimize the spread of fire, pursuant to MM 01 and MM 02 (see Section 4.16, <br />Public Services). In addition, proposed residences would be required to comply with the California <br />Fire Code with regard to access and building materials. Adherence to the Public Resource Code <br />Section 4291 (providing defensible space around buildings and restriction of fire-prone plant <br />materials and flammable mulches) would reduce the risk of damage from fire to the maximum <br />extent practicable. Therefore, the proposed project would not result in any peculiar effects and <br />would not result in new or more severe impacts related to wildland fires beyond what was <br />previously analyzed in the 1998 HVSP FEIR. <br />FEIR Mitigation Measures <br />MM I1 Completion of a Phase I Environmental Site Assessment by a qualified environmental <br />professional in accordance with the requirements of the American Society for <br />Testing and Materials (ASTM 1997) is required. <br />Timing: Prior to approval of grading permits for the Golf Course and Spotorno <br />properties. <br />MM I6 Preparation of a Spill and Pollution Prevention Plan must be prepared by the <br />contractor(s) for each development project with soil disturbance (e.g., grading) of at <br />least 5.0 acres. The Plan must (1) be prepared prior to the start of earthwork <br />activities, (2) designate an on-site employee responsible for Plan implementation, <br />and (3) include anticipated equipment needs and maintenance, emergency response <br />procedures for hazardous materials releases, and procedures for contacting <br />designated regulatory agencies in the event of a hazardous materials release. <br />Timing: Plan preparation prior to issuance of a grading permit; plan implementation <br />during earthwork and construction activities. <br /> <br />27 City of Pleasanton. 2013. Pleasanton General Plan 2005 – 2025 Public Safety Element. Website: <br />https://www.cityofpleasantonca.gov/civicax/filebank/blobdload.aspx?BlobID=23899. Accessed January 18, 2021. <br />28 California Department of Forestry and Fire Protection (CAL FIRE). 2007. Alameda County Fire Hazard Maps. Website: <br />https://osfm.fire.ca.gov/media/7271/fhszs_map1.pdf. Accessed February 22, 2021.