My WebLink
|
Help
|
About
|
Sign Out
14 ATTACHMENT 6 - Appendix A - E
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
021522
>
14 ATTACHMENT 6 - Appendix A - E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 11:41:35 AM
Creation date
2/10/2022 11:33:11 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/15/2022
DESTRUCT DATE
15Y
Document Relationships
14
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
14 ATTACHMENT 1-5
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
14 ATTACHMENT 6 - Appendix F - I
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton–Spotorno Ranch Reduced Development Project <br />Initial Study/Consistency Checklist Environmental Checklist <br /> <br /> <br />FirstCarbon Solutions 119 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480021/Consistency Checklist/21480021 Spotorno Ranch Consistency Checklist ScreenCheck.docx <br />c) Drainage <br />Would the project: Substantially alter the existing drainage pattern of the site or area, including <br />through the alteration of the course of a stream or river or through the <br />addition of impervious surfaces, in a manner which would: <br />i) result in substantial erosion or siltation on- or off-site; <br />The 1998 HVSP FEIR determined that erosion and sedimentation could occur during the construction <br />period as a result of grading and excavation activities. The 1998 HVSP FEIR included measures to <br />control erosion associated with the Golf Course; however, no conclusion was made regarding erosion <br />or siltation on the project site. According to the 1998 HVSP FEIR, compliance with the Construction <br />General Permit and preparation of a SWPPP that includes BMPs would prevent impacts related to <br />water quality and erosion. The BMPs would be required to include erosion and sediment control <br />measures, such as soil stabilization controls, watering for dust control, perimeter silt fences, <br />placement of hay bales, and sediment basins. According to the 1998 HVSP FEIR, implementation of <br />BMPs required in the SWPPP would reduce impacts to less than significant. <br />The majority of the project site would be left undeveloped, and existing drainage would not be <br />modified. No impervious surfaces would be constructed outside the Residential Development Area <br />and drainage would continue to be directed to existing natural drainages. <br />The landscape would be substantially altered on the 31-acre portion of the project site that would be <br />developed, which may affect the existing natural drainage pattern on the project site. Compliance <br />with the General Construction permit conditions and the applicable provisions of the Municipal <br />Code would ensure that the project implementation does not result in substantial erosion or <br />siltation on- or off-site. <br />The proposed project would require the installation of new on-site storm drainage infrastructure. <br />The on-site storm drainage system would consist of a network of street gutters, inlets, basins, and <br />underground piping that would ultimately convey runoff to five different detention basins. The <br />proposed project’s landscaping plans feature groundcover, DMAs, bioretention, and self-retaining <br />areas to increase infiltration rates and reduce runoff volumes and erosion and sedimentation. As <br />described previously, the project would be required to comply with Chapter 9.14 Stormwater <br />Management and Discharge Control of the City of Pleasanton Municipal Code. Chapter 9.14, also <br />known as the City of Pleasanton Stormwater Management and Discharge Control Ordinance, <br />requires implementation of BMPs and compliance with general permits. <br />The provision of the on-site stormwater infrastructure would ensure that the project would not <br />result in substantial erosion. The proposed project would not create or contribute runoff water that <br />would exceed the capacity of the drainage system. Adherence to all applicable regulations from the <br />Alameda County Clean Water Program, City of Pleasanton Municipal Code, and California State <br />Water Resources Control Board (State Water Board) would ensure that the proposed project does <br />not result in substantial erosion or siltation.
The URL can be used to link to this page
Your browser does not support the video tag.