Laserfiche WebLink
City of Pleasanton–Spotorno Ranch Reduced Development Project <br />Environmental Checklist Initial Study/Consistency Checklist <br /> <br /> <br />120 FirstCarbon Solutions <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480021/Consistency Checklist/21480021 Spotorno Ranch Consistency Checklist ScreenCheck.docx <br />As discussed previously, consistent with the 1998 HVSP FEIR, the proposed project would comply <br />with the NPDES permit issued by the RWQCB. Under the NPDES permitting program, the proposed <br />project would be required to prepare and implement a SWPPP because it is more than 1 acre in size. <br />The SWPPP would identify potential sources of erosion or sedimentation that may be reasonably <br />expected to affect the quality of stormwater discharges as well as identify BMPs that ensure the <br />reduction of these pollutants during stormwater discharges. <br />Therefore, the proposed project would not result in any peculiar effects and would not result in new <br />or more severe impacts related to erosion or siltation beyond what was previously analyzed in the <br />1998 HVSP FEIR. <br />(ii) substantially increase the rate or amount of surface runoff in a manner which would result in <br />flooding on- or off-site; <br />The 1998 HVSP FEIR determined that the project site is not located within the mapped 100-year <br />flood hazard area or dam failure inundation area that limited flooding has been known to occur <br />during winter storms along Alisal Street and Happy Valley Road. The 1998 HVSP FEIR’s planning, and <br />development actions included storm drainage facilities such as detention basins, wet ponds, and <br />grass swales to be integrated into specific projects to reduce the frequency and severity of flooding; <br />in addition, minor improvements will be made to reduce flooding along Alisal Street near the Faith <br />Chapel Assembly of God. Impacts were determined to be less than significant. <br />Development of the proposed residential lots would result in a net increase of impervious surfaces. <br />Increased runoff volume could exceed the capacity of downstream drainage components, causing <br />localized flooding. As discussed above, the HVSP noted there were areas in the project vicinity where <br />flooding has been known to occur. However, the City of Pleasanton’s Department of Engineering <br />determined that there does not appear to be flooding issues within the Spotorno property, and the <br />proposed detention area could accommodate any anticipated runoff from the project. The proposed <br />bioretention areas and self-retaining areas would control the volume and flow of runoff on-site. <br />Therefore, the proposed project would not result in any peculiar effects and would not result in new <br />or more severe impacts related to flooding from runoff beyond what was previously analyzed in the <br />1998 HVSP FEIR. <br />(iii) create or contribute runoff water which would exceed the capacity of existing or planned <br />stormwater drainage systems or provide substantial additional sources of polluted runoff; <br />The 1998 HVSP FEIR determined that stormwater runoff would increase as a result of more intensive <br />development in the planning area. Residential development would introduce urban pollutants to <br />surface runoff typical of that found in other similar residential areas, but hazardous substances are <br />not expected. Drainage system improvements will be subject to current City standards. The Federal <br />Emergency Management Agency (FEMA) flood hazard maps indicate that the project site is not <br />located within a flood-prone area; however, portions of the Happy Valley Creek are known to <br />experience occasional localized flooding. The 1998 HVSP FEIR concluded that this impact may be <br />significant. Additionally, the 1998 HVSP FEIR required MM G4, which would require practices to <br />improve drainage conditions along Alisal Street, and MM G5, which would require replacement of