Laserfiche WebLink
City of Pleasanton–Spotorno Ranch Reduced Development Project <br />Environmental Checklist Initial Study/Consistency Checklist <br /> <br /> <br />128 FirstCarbon Solutions <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480021/Consistency Checklist/21480021 Spotorno Ranch Consistency Checklist ScreenCheck.docx <br />inclusion in the recorded deed of sale of all subdivided parcels and in all property <br />lease agreements within the Plan Area of a statement, signed by the future <br />owner/tenant, describing the presence of a nearby agricultural use and the potential <br />nuisances associated with that use. (The precise language of the statement is <br />included in the Specific Plan.) <br />Timing: Procedure to be required as a condition of subdivision map approval and <br />building permit approval. <br />MM A3 Before development of Golf Course housing or housing in the Spotorno Upper Valley <br />LDR and MDR areas or the Spotorno Flat Area may occur, the City (which would own <br />the Golf Course and open space lands) and developer(s) must prepare and approve a <br />Wildland/Urban Interface Management Plan that contains (1) standards for the <br />management of vegetation at the edge of the wildland or open space area near built <br />areas and (2) standards for the design and construction of buildings adjacent to the <br />wildland or open spaces. <br />Timing: Prior to issuance of the first building permit on the affected properties. <br />MM A4 Construction of the Golf Course, housing, road, infrastructure, and other site <br />improvements is limited to the hours of 8:00 a.m. to 5:00 p.m., Monday through <br />Saturday. <br />Timing: During construction. <br />Conclusion <br />No new significant impacts to land use would occur. The conclusions from the 1998 HVSP FEIR <br />remain unchanged.