My WebLink
|
Help
|
About
|
Sign Out
14 ATTACHMENT 6 - Appendix A - E
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
021522
>
14 ATTACHMENT 6 - Appendix A - E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 11:41:35 AM
Creation date
2/10/2022 11:33:11 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/15/2022
DESTRUCT DATE
15Y
Document Relationships
14
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
14 ATTACHMENT 1-5
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
14 ATTACHMENT 6 - Appendix F - I
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton–Spotorno Ranch Reduced Development Project <br />Environmental Checklist Initial Study/Consistency Checklist <br /> <br /> <br />150 FirstCarbon Solutions <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480021/Consistency Checklist/21480021 Spotorno Ranch Consistency Checklist ScreenCheck.docx <br />• Scenario 8: Far-Term (Cumulative) Project Conditions without Bypass Road—Traffic volumes <br />from Scenario 7 plus traffic estimated for the project. Roadway improvements included as part <br />of the project are considered. <br />• Scenario 9: Far-Term (Cumulative) Project Conditions with Bypass Road—Traffic volumes from <br />Scenario 7 considering the Bypass Road and potential traffic shifts associated with the new <br />roadway, plus project traffic. <br /> <br />CEQA Significance Thresholds <br />For the Tran sportation Assessment and VMT Analysis, based on the updated Appendix G <br />Environmental Checklist Form, City of Pleasanton and Tri-Valley Transportation Plan and Action Plan, <br />a significant transportation-related impact could occur if the project would: <br />A. Conflict with a program, plan, ordinance, or policy addressing the circulation system, <br />including roadway, transit, bicycle and pedestrian facilities. <br /> <br />Roadway System–The project would create a significant impact related to the roadway <br />system if any of the following criteria are met: <br />1. At unsignalized intersections, the project results in any of the traffic signal warrants <br />included in the CA Manual on Uniform Traffic Control Devices (MUTCD) to be satisfied, or <br />for a location where any of the warrants are satisfied prior to the project, the project <br />increases travel through the controlled approach by 10 or more vehicles. <br />2. The project creates the potential for excessive vehicle queue spillback that could <br />periodically block or interfere with pedestrian, bicycle or transit facilities. <br /> <br />Transit System–The project would create a significant impact related to transit service if the <br />following criterion is met: <br />1. Conflict with an existing or planned transit facility; <br />2. Conflict with transit policies adopted by the City of Pleasanton, Alameda CTC, Wheels <br />(LAVTA), or Bay Area Rapid Transit (BART) for their respective facilities in the planning <br />area; or <br />3. Disrupt existing transit services or facilities. <br /> <br />Bicycle System–The project would create a significant impact related to the bicycle system if <br />any of the following criteria are met: <br />1. Disrupt existing bicycle facilities; or <br />2. Interfere with planned bicycle facilities; or <br />3. Create inconsistencies with adopted bicycle system plans, guidelines, policies, or <br />standards. <br />
The URL can be used to link to this page
Your browser does not support the video tag.