Laserfiche WebLink
City of Pleasanton–Spotorno Ranch Reduced Development Project <br />Environmental Checklist Initial Study/Consistency Checklist <br /> <br /> <br />150 FirstCarbon Solutions <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480021/Consistency Checklist/21480021 Spotorno Ranch Consistency Checklist ScreenCheck.docx <br />• Scenario 8: Far-Term (Cumulative) Project Conditions without Bypass Road—Traffic volumes <br />from Scenario 7 plus traffic estimated for the project. Roadway improvements included as part <br />of the project are considered. <br />• Scenario 9: Far-Term (Cumulative) Project Conditions with Bypass Road—Traffic volumes from <br />Scenario 7 considering the Bypass Road and potential traffic shifts associated with the new <br />roadway, plus project traffic. <br /> <br />CEQA Significance Thresholds <br />For the Tran sportation Assessment and VMT Analysis, based on the updated Appendix G <br />Environmental Checklist Form, City of Pleasanton and Tri-Valley Transportation Plan and Action Plan, <br />a significant transportation-related impact could occur if the project would: <br />A. Conflict with a program, plan, ordinance, or policy addressing the circulation system, <br />including roadway, transit, bicycle and pedestrian facilities. <br /> <br />Roadway System–The project would create a significant impact related to the roadway <br />system if any of the following criteria are met: <br />1. At unsignalized intersections, the project results in any of the traffic signal warrants <br />included in the CA Manual on Uniform Traffic Control Devices (MUTCD) to be satisfied, or <br />for a location where any of the warrants are satisfied prior to the project, the project <br />increases travel through the controlled approach by 10 or more vehicles. <br />2. The project creates the potential for excessive vehicle queue spillback that could <br />periodically block or interfere with pedestrian, bicycle or transit facilities. <br /> <br />Transit System–The project would create a significant impact related to transit service if the <br />following criterion is met: <br />1. Conflict with an existing or planned transit facility; <br />2. Conflict with transit policies adopted by the City of Pleasanton, Alameda CTC, Wheels <br />(LAVTA), or Bay Area Rapid Transit (BART) for their respective facilities in the planning <br />area; or <br />3. Disrupt existing transit services or facilities. <br /> <br />Bicycle System–The project would create a significant impact related to the bicycle system if <br />any of the following criteria are met: <br />1. Disrupt existing bicycle facilities; or <br />2. Interfere with planned bicycle facilities; or <br />3. Create inconsistencies with adopted bicycle system plans, guidelines, policies, or <br />standards. <br />