My WebLink
|
Help
|
About
|
Sign Out
14 ATTACHMENT 6 - Appendix A - E
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
021522
>
14 ATTACHMENT 6 - Appendix A - E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 11:41:35 AM
Creation date
2/10/2022 11:33:11 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/15/2022
DESTRUCT DATE
15Y
Document Relationships
14
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
14 ATTACHMENT 1-5
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
14 ATTACHMENT 6 - Appendix F - I
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton–Spotorno Ranch Reduced Development Project <br />Environmental Checklist Initial Study/Consistency Checklist <br /> <br /> <br />156 FirstCarbon Solutions <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480021/Consistency Checklist/21480021 Spotorno Ranch Consistency Checklist ScreenCheck.docx <br />Roadway Facility Type <br />Without <br />Project Daily <br />Traffic <br />Percent <br />Daily <br />Fluctuation <br />Cumulative With Project <br />Project <br />Traffic <br />With <br />Project <br />Percent <br />Increase <br />Westbridge Lane (east of <br />Alisal Street) <br />Local Street 1,330 ±3 70 1,400 5% <br />Sycamore Creek Way (east <br />of Summit Creek Lane) <br />Residential Collector 1,160 ±8% 0 1,160 0% <br />Source: Fehr & Peers, 2018 and 2020. <br /> <br />One significant off-site impact was identified in the existing condition; and one significant off-site <br />impact was identified in the cumulative condition. The impact in the existing condition was related <br />to construction activities, and the cumulative impact was related to intersection operations. <br />Construction-related activities could create potential conflicts with other roadway users, such as <br />construction-related activities resulting in lane closures along the project frontage, construction <br />vehicles queueing within the public right-of-way waiting entry to the site, construction worker <br />parking in non-designated parking areas, or construction debris on public streets. Construction <br />impacts would be temporary in nature; however, this impact would require mitigation, as proposed <br />in the 1998 HVSP FEIR MM B6. A construction management plan would enhance the intent of the <br />original mitigation measures and would reduce the project’s potential for construction vehicle <br />conflicts with other roadway users. Implementation of MM B6 and the construction management <br />plan MMTrans-1 as a condition of approval for the proposed project would reduce the temporary <br />construction impacts to less than significant. <br />Although construction impacts would be temporary, development of a construction management <br />plan would reduce the potential for construction vehicle conflicts with other roadway users. Because <br />MM B6 is intended to mitigate conflicts between roadway users, the preparation of a construction <br />management plan to further reduce potential conflicts between roadway users during construction, <br />consistent with the intent of MM B6. Additionally, the proposed project would pay all applicable <br />local and regional transportation impact fees to fund the construction of planned roadway <br />improvements in the area. Therefore, with the addition of a condition of approval to enhance the <br />intent of MM B6 as it applies to the Spotorno Project, the proposed project would not result in any <br />peculiar effects and would not result in new or more severe impacts related to LOS standards and <br />travel demand measures, or other standards for designated roads or highways beyond what was <br />previously analyzed in the 1998 HVSP FEIR. <br />b) Inconsistent with CEQA Guidelines Section 15064.3 <br />Would the project: Would the project conflict or be inconsistent with CEQA Guidelines Section <br />15064.3, subdivision (b)? <br />This question was not included in the 1998 HVSP FEIR. No determination was made in the 1998 <br />HVSP FEIR regarding the level of significance related to the HVSP’s consistency with CEQA Guidelines
The URL can be used to link to this page
Your browser does not support the video tag.