Laserfiche WebLink
City of Pleasanton–Spotorno Ranch Reduced Development Project <br />Initial Study/Consistency Checklist Environmental Checklist <br /> <br /> <br />FirstCarbon Solutions 157 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480021/Consistency Checklist/21480021 Spotorno Ranch Consistency Checklist ScreenCheck.docx <br />Section 15064.3, subdivision (b), which relates to the project’s impacts on VMT, because this <br />question was not a part of the CEQA checklist at the time. <br />c) Roadway Safety Hazards <br />Would the project: Substantially increase hazards due to a geometric design feature (e.g., sharp <br />curves or dangerous intersections) or incompatible uses (e.g., farm equipment)? <br />The 1998 HVSP FEIR determined that additional traffic in the project area would increase the <br />potential for accidents and safety hazards, particularly on Happy Valley Road. The 1998 HVSP FEIR <br />determined that roadway improvements and new traffic signs called for in the Specific Plan will <br />improve traffic safety and mitigate potential hazards resulting from increased traffic. The 1998 HVSP <br />FEIR concluded that those impacts would be less than significant with mitigation. <br />Access to the project site would be provided via the proposed Spotorno Ranch Drive, which would <br />connect to Westbridge Lane on the eastern side of the proposed residential area, and to Alisal Street <br />on the western side of the project site. The proposed project would not include the construction of <br />Bypass Road linking Westbridge Lane with Sycamore Creek Way, which was previously proposed in <br />the 1998 HVSP FEIR. The proposed project would be constructed to meet existing City design <br />standards. <br />According to the Transportation Assessment Update, the connection to Alisal Street would occur <br />where the roadway makes a 90-degree bend. The intersection influence area is also in proximity to a <br />driveway for the Faith Chapel Assembly of God. These factors could create right-of-way confusion. <br />Spotorno Ranch Road would form a T-intersection at Westbridge Lane. Therefore, the analysis <br />recommended: (1) reconstructing the future intersection Spotorno Ranch Road at Alisal Street such <br />that the west leg of the intersection T’s into the north–south leg; and (2) providing stop control for <br />vehicles traveling eastbound on Alisal Street or consider implementing an all-way stop-control. <br />Signage should be installed on Alisal Street for vehicles traveling northbound to indicate that vehicles <br />must turn left to remain on Alisal Street. New intersection lighting may need to be installed, <br />consistent with the requirements in the HVSP that allows safety lighting to be installed at <br />intersections. Additionally, the Transportation Assessment Update recommends that: (1) the future <br />intersection of Spotorno Ranch Road at Westbridge Lane be installed with a stop sign on Spotorno <br />Ranch Road for vehicles turning to Westbridge Lane, and that (2) any landscaping plans for this area <br />should be reviewed such that future landscaping does not block sight distance. <br />The HVSP identified 12-foot lane width as the preferred width for new roadways with the area, <br />although 10 to 12 feet is permitted on some roadways. Although the HVSP identifies 12-foot travel <br />lanes, those are typically for roadways without trails or sidewalks. Since Spotorno Ranch Road would <br />provide a trail on one side of the street, and a sidewalk on the other, the added width of the travel <br />lane to accommodate other travel modes could encourage higher vehicle speeds. The need for 12- <br />foot-wide roadways should be balanced against other HVSP goals.