Laserfiche WebLink
City of Pleasanton–Spotorno Ranch Reduced Development Project <br />Initial Study/Consistency Checklist Environmental Checklist <br /> <br /> <br />FirstCarbon Solutions 163 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480021/Consistency Checklist/21480021 Spotorno Ranch Consistency Checklist ScreenCheck.docx <br />number of people assumed to live in a single-family house (3), so an ADU would use 66 percent of <br />the average single-family usage. This provides an estimate of 2,425 GPD for the 22 ADUs, and a total <br />estimate of 6,099 GPD of wastewater generated by the proposed project. As discussed previously, <br />the City of Pleasanton has an average annual wastewater flow of approximately 6.0 MGD and a <br />wastewater treatment capacity of 8.5 MGD, leaving 2.5 MGD of remaining capacity.51 The 6,099 GPD <br />of wastewater generated by the proposed project would equate to a nominal increase in the City’s <br />remaining 2.5 MGD capacity. The wastewater generated by the proposed project would be within <br />the permitted capacity of the DSRSD and would not exceed what was previously analyzed in the <br />1998 HVSP FEIR. A 2016 Happy Valley Water and Sewer Study was conducted by RMC Water and <br />Environment and determine that the existing wastewater structure was sufficient to accommodate <br />additional flows from the buildout of the HVSP.52 <br />The project does not propose any industrial or commercial uses where pollutant levels or <br />wastewater volumes are typically high. Therefore, the proposed project would not exceed <br />wastewater treatment requirements established by the San Francisco Bay RWQCB. Additionally, the <br />project applicant would be responsible for its fair share of the City’s water system master plan <br />improvements, and the proposed project would comply with General Plan Water Programs VI-4.5 <br />and 4.6 to reduce water use. Therefore, the proposed project would not result in any peculiar effects <br />related to wastewater and would not result in new or more severe impacts beyond what was <br />previously analyzed in the 1998 HVSP FEIR. <br />Stormwater <br />The project site consists of mostly undeveloped land and does not include any existing utility <br />infrastructure. Existing water, wastewater, and stormwater infrastructure is located immediately <br />adjacent to the project site, within Alisal Street and Westbridge Lane. The construction of new <br />stormwater drainage facilities would connect to this existing infrastructure. <br />Development of the proposed residential units would result in a net increase of impervious surfaces <br />consisting of buildings, paved roadways, and driveways. Increased runoff volume could exceed the <br />capacity of downstream drainage components, causing localized flooding. As discussed previously, <br />there are areas in the project vicinity where flooding occurs because of deficient stormwater <br />systems. According to the HVSP, the crossroad drain lines along the Spotorno Flat Area frontage of <br />Alisal Street need to be replaced with properly sized culverts. In addition, roadside drainage along <br />the Spotorno Flat Area frontage of Alisal Street needs to be improved. As discussed in Appendix J, <br />MM G1, MM G4, and MM G5, as outlined in the 1998 HVSP FEIR, included as Appendix A of this <br />document, would be incorporated into the proposed project as conditions of approval. <br />The proposed project would be served by existing stormwater facilities maintained by the City of <br />Pleasanton. The City’s storm drainage system is composed mostly of curb inlets, underground pipes, <br />local channels, and natural swales. Storm drainage pipes varying from 24 to 36 inches would run <br /> <br />51 City of Pleasanton. 2009. 2005 General Plan 2025, Chapter 8 Water Element. Website: <br />https://www.cityofpleasantonca.gov/civicax/filebank/blobdload.aspx?BlobID=23911. Accessed February 17, 2021. <br />52 RMC Water and Environment. November 21, 2016. Happy Valley Water and Sewer Study Technical Memorandum.