My WebLink
|
Help
|
About
|
Sign Out
14 ATTACHMENT 6 - Appendix A - E
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
021522
>
14 ATTACHMENT 6 - Appendix A - E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 11:41:35 AM
Creation date
2/10/2022 11:33:11 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/15/2022
DESTRUCT DATE
15Y
Document Relationships
14
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
14 ATTACHMENT 1-5
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
14 ATTACHMENT 6 - Appendix F - I
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton–Spotorno Ranch Reduced Development Project <br />Environmental Checklist Initial Study/Consistency Checklist <br /> <br /> <br />162 FirstCarbon Solutions <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480021/Consistency Checklist/21480021 Spotorno Ranch Consistency Checklist ScreenCheck.docx <br />Wastewater <br />The 1998 HVSP FEIR determined that the single-family residential development permitted by the <br />HVSP would generate wastewater totaling approximately 81,200 GPD based on a standard <br />generation factor of 280 GPD.46 With installation of water conservation devices consistent with <br />General Plan Water Programs VI-4.5 and 4.6, the amount of wastewater generated by residential <br />development in the HVSP area would be reduced to 78,974 GPD.47 The 1998 HVSP FEIR determined <br />that wastewater generated by the proposed project would not exceed the amount accounted for in <br />the Pleasanton Sewer Master Plan. The existing collection systems would be adequate to handle <br />these flows. Together with other development permitted by the Pleasanton General Plan, buildout <br />of the project would add to existing flows, but would not exceed the capacity of sewer mains to <br />which the HVSP area would be connected. Impacts were considered less than significant. <br />The proposed project could have a significant impact if the project would not be served by a <br />wastewater treatment plant with an adequate capacity or would require the construction of new or <br />expanded facilities, or if the project creates wastewater that exceeds the wastewater treatment <br />requirements of the San Francisco Bay RWQCB established by Order R2-2017-0017 NPDES Permit <br />No. CA0037613, Waste Discharge Requirements and Master Reclamation Permit for the Diablo San <br />Ramon Service District (DSRSD), Livermore-Amador Valley Wastewater Management Authority <br />(LAVWMA ), and the East Bay Dischargers (EBDA). Wastewater from the project would be conveyed <br />to the DSRSD Regional Wastewater Treatment Facility (RWTF) for treatment and then exported to <br />the LAVWMA system where it would be conveyed to the EBDA before being released into the San <br />Francisco Bay. Wastewater from the project would consist mostly of effluent typical of residential <br />uses and as such would not substantially increase pollutant levels in the wastewater or exceed <br />RWQCB standards. <br />After certification of the 1998 HVSP FEIR, the RWTF completed an expansion project to bring the <br />average dry weather wastewater flow design capacity from 11.5 MGD of wastewater treatment <br />capacity to 17 MGD. The City of Pleasanton is currently entitled to half of this treatment capacity, or <br />8.5 MGD. The City’s average annual wastewater flow is approximately 6.0 MGD, leaving an additional <br />2.5 MGD of capacity, which is sufficient to serve Pleasanton’s planned buildout growth as anticipated <br />in the General Plan.48 The maximum treatment plant ultimate design capacity is currently planned <br />for 20.7 MGD average dry weather flow. Future expansion would allow Pleasanton dry weather flows <br />to reach, but not to exceed, 10.3 MGD, if needed.49 <br />The DSRSD determined that average wastewater flow from a single-family residence equated to 167 <br />GPD.50 Under this assumption, 22 single-family homes would generate approximately 3,674 GPD of <br />wastewater. Assuming that the average occupancy of an ADU is 2, that would be 66 percent of the <br /> <br />46 City of Pleasanton. 1998. Draft Environmental Impact Report, Happy Valley Specific Plan, Table 20, Estimated ADWF Wastewater <br />Generation with Standard Generation Rates. <br />47 City of Pleasanton. 1998. Draft Environmental Impact Report, Happy Valley Specific Plan, Table 21, Estimated ADWF Wastewater <br />Generation with Mitigated Generation Rates. <br />48 City of Pleasanton. 2009. 2005 General Plan 2025 Chapter 8 Water Element. Website: <br />https://www.cityofpleasantonca.gov/civicax/filebank/blobdload.aspx?BlobID=23911. Accessed February 17, 2021. <br />49 Ibid. <br />50 Dublin San Ramon Services District. 2021. Fact Sheet. January 1. Website: http://www.dsrsd.com/home/showdocument?id=811. <br />Accessed February 17, 2021.
The URL can be used to link to this page
Your browser does not support the video tag.